ANTI-TERMITE TREATMENT

Materials and Tools usedChemicals UsedDildrin Aldrin Heptachlor Chlordane Chloropyripas 20 ECEquipmentCrow bar Measuring Jar Plastic drums 20-lit capacity. Pouring Jar SprayerWorking ProcedureThe anti termite treatment will be done by an approved specialized agency. The earth surface to be cleaned from wooden and any other garbage Particles. The entire ...

Continue reading

PLAIN CEMENT CONCRETE (PCC)-WORK PROCEDURE

Materials and Tools usedAuto level instrument – 1 Nos Wooden /Steel rammer – 1 Nos Mixer machine – 1 NosScope of workVerifying levels and dimension Ramming the earth surface Placing the concrete. Ramming and finishing the concrete surfaceWorking ProcedureExcavation levels and dimensions to be checked ...

Continue reading

WORK PROCEDURE – EXCAVATION

EXCAVATION is the preliminary activity of the construction project. It starts from the pits for the building foundations and continues up to the handing over of the project. ...

Continue reading

COMPACTION FACTOR TEST

AIM To study the workability of concrete APPARATUS Compaction factor apparatus’ trowels, hand scoop (15.2 cm long), a rod of steel or other suitable material (1.6 cm diameter, 61 cm long rounded at one end ) and a balance. SAMPLING Concrete mix (M15) is ...

Continue reading

COMPRESSIVE STRENGTH OF MORTAR CUBES

AIM To find the compressive strength of standard cement sand mortar cubes. APPARATUS 7.06cm cubes moulds (50cm2 face area), apparatus for gauging and mixing mortar, vibrator, compression testing maching etc. PROCEDURE Take 200gm of cement and 600gm of standard sand in the proportion 1:3 by ...

Continue reading

FINAL SETTING TIME OF CEMENT

To determine the final setting time of cement. This test is required to understand the rate of gain of strength of cement w.r.t. to time. APPARATUS Vicat apparatus, needle for initial setting time, stop watch. PROCEDURE Take 400 gm of cement in a pan. ...

Continue reading

INITIAL SETTING TIME OF CEMENT (IS 4031, IS 269)

To determine the initial setting time of cement. This test is required to understand the time cement takes for initial setting between mixing and transporting and placing of concrete. APPARATUS Vicat apparatus, needle for initial setting time, stop watch. PROCEDURE Take 400 gm of cement in ...

Continue reading

STANDARD CONSISTENCY OF CEMENT

To determine the quantity of water required to produce a cement paste of standard consistency. The standard consistency is that consistency, which will permit the vicat plunger to penetrate to a point 5 to 7mm from the bottom of the vicat ...

Continue reading

THE CHARPY IMPACT TEST

Objective: To test the resistance of the material towards an impact load Apparatus: Charpy Testing machine, a rod of mild steel and a rod of carbonate steel.Introduction:The Charpy impact test is one of the impact-testing that is used to determine the resistance towards ...

Continue reading