Preparation The ground over which the filling has to be done should be cleaned off all grass, loose stones, rubbish of all kinds etc. If there is water in the area, it should be pumped or bailed out. If the plinth depth doesn’t exceed 45cm above ground level and if the exposed ground is B.C.(…)