The organic prestressing system is a concept taken as an inspiration from the behavior of an organic structure (biomimetic or the nature formed structures) that is derived from nature, called the muscle. This resemble an active control system of prestressing. The main objective of organic prestressing system is to reduce the stresses or the deformations caused due to the live load. The OPS can be defined as an automatic adaptive prestressing system that has the capability to either increase or decrease the prestressing force based on the load variation under service conditions of the structure. For more understanding, one can express the organic prestressing system as a prestressing system that automatically adjust the tension applied to the cables based on the loads actuated. This is carried out by means of a control system. This adjusting serve the objective of minimizing the tensions and the structural deformations. The development of OPS originated by a research project on Organic Prestressing which was initiated in FEUP. The results of the first numerical simulations bought a conclusion that the organic prestressing is mainly useful for the bridge equipment structures. As the bridge construction have large importance on the variation in live load and deformations, the OPS can work best for the same. The development of OPS can be explained in the following stages of development, as shown in the table below. Table.1.OPS Technology – Historic Synopsis
Year Accomplishments
1994-1999 The R&D stage is developed at FEUP
2003 The initial lab model
2004 The first application of OPS system in full scale. The pilot project developed in FEUP
2009 The OPS Bowstring Concept for 70M span
2011 Upgrade of OPS for temperatures less than zero, First Large Viaduct; Multi-span
2013 The first application of OPS for Cable stayed
2014 Precast Segmental Construction – Use of OPS in launching Gantries
2015 Application on 90-meter Span Multi -span Viaducts

Organic Prestressing System Browsing Concept

The OPS browsing system was developed between the period 2007 and 2009. The overhead equipment is gained by some of the browsing concept. The browsing concept have certain advantages in applications like in the movable scaffolding systems (MSS). The movable scaffolding systems help in construction of bridge have curved curvature. This makes the assemblage more important. This method brings more stability in the launching stage. The organic prestressing system concept have also been developed in large movable scaffolding systems (LMSS).

Fig.1: Main Components of Organic Prestressing System Browsing Concept

Elements and Concept of Organic Prestressing System

The main elements of OPS system considering the bridge construction equipment as the explanatory reference are the:
  1. The activator and the active anchorage
  2. The un-bonded cables used
  3. The sensors
  4. The electronic controller is present in the girder control unit
  5. The passive anchorage
  6. The deviation shores
The figure-2 shows a clear explanation about the following.

Fig.2: The main elements involved in a OPS technology in Bridge Construction

An algorithm that employs the girder mid-span deflection as the major variable is used as the criteria for OPS control. The pressure transducers are installed to monitor and measure the mid-span deflection. The sensors will continuously send signal to the control unit of the whole arrangement (PLC). This control algorithm decides the decision based on the actuation of the loads. This change is affected on the tension of the cables that are prestressed. These variations are related to the hydraulic cylinders’ stroke variations. Now the mid-span deflection is the factor that govern the actuation decision. The OPS are provided with distinctive and redundant sensors which will measure accurately and correctly. This guarantee that the algorithm decision is taken based on an accurate information. Many warning operators are provided, to check the data. These operators work if any kind of inconsistency is detected. There are several alarm combinations to facilitate this incoherence and warn the operator to check the data. This facility is available on real time through a touch screen interface. This is installed on the girder control unit. The operator has to confirm whether the data is correct or not, based on which immediate action is taken. This is to ensure that the operation is carried out regularly further and the cause of risk is prevented. Here, the bridge equipment behavior is clearly provided to the operator. This way the OPS system helps in the improvement of safety factor of the structure.

Advantages of Organic Prestressing System

Some of the advantages that is gained by the installation of OPS system are:

Applications of Organic Prestressing System

The OPS system has been applied in the launching of gantry equipment in segmental construction of bridges. The OPS technology works best for the construction of long span bridges. Other than the advantages mentioned above, it also has the capability to overcome the challenges like: The deflection control in OPS system overcome the precast segmental construction span by span. They let new limits of construction bringing new creativity.

Features of Organic Prestressing Technology

The main features of OPS technology in bridge construction are: Also Read: Protective Systems for Reinforced Concrete Structures Site Selection for Green Office Building based on LEED System Excavation Monitoring System -Types and Objectives for Safety in Construction Automated Material Management and Handling in Construction Projects Proprietary Trench Support Systems Used in Construction