The Constructor

How to determine Depth and Number of Boreholes for Geostructures? [PDF]

How to Determine Number and depths of boreholes for Geotechnical structures

Reading time: 1 minute

The determination of adequate number and sufficient depth of boreholes is critical to gather enough data for the design and construction of geostructures such as foundations, bridges, retaining walls, cut slopes, and embankments.

There is no specific rule to determine borehole number and depth. Therefore, several factors, such as structural importance, the geological character of the ground, and equipment availability, can play an important role.

One should take full advantage of engineering experience and judgment, and follow guidelines of applicable codes to determine the minimum number and depth of boreholes. The quantity and depth of boreholes should cover the soil zone that is affected by the load of the geostructure.

How to determine Number and Depths of Boreholes for Geostructures?

Building area, m2Number of boreholesSubdivision area, m2Number of boreholes
100240002
250380003
5004200004
10005400005
20006800007
500074000015
60008--
80009--
1000010--
Table-1: Minimum Number of Boreholes for Buildings and Subdivisions Based on Area
Geostructure typesMinimum borehole depthMinimum number of boreholes
Shallow foundation5m, or foundation width time a value ranging from 1 to 3One but place boreholes at node points along grids of sizes from 15mX15m to 40mX40m
Deep foundation25-30m except for bedrock which is 3mOne but place boreholes at node points along grids of sizes from 15mX15m to 40mX40m
Retaining wall1 to 2 times wall height, 3m for walls on bedrockOne borehole for wall-length smaller than 30m,
For wall-length longer than 30m; 1 for every 30m or wall height times a value between 1 to 2
Bridge25-30m except for bedrock which is 3mTwo boreholes for piers, Two boreholes for abutments
Embankments including roadwayEither 6m or two times embankment height, whichever is greater1 for every 60m
If soil does not vary crucially, otherwise 1 for every 120m
Cut slopes6m below the bottom of the cut slopeOn slope: 3 boreholes
Along the length of the slope: 1 for every 60m
If soil does not vary crucially, otherwise 1 for every 120m
Table-2: Minimum Number and Depth of Boreholes for Various Geostructures Based on Soil Type
Fig. 2: Borehole Sample

FAQs

What is the purpose of borehole?

Boreholes are used to take soil samples which are then tested to get enough information about the construction site to enable engineers to set safe designs and execute construction processes properly.

What should be the depth of borehole in bedrock?

The depth of borehole in bedrock should be 3m.

How many boreholes are required for bridge construction?

Minimum two boreholes for bridge abutment and two boreholes for piers are needed.

How many boreholes are needed for adequate soil report?

There is no specific rule to determine borehole number and depth. Therefore, several factors, such as structural importance, the geological character of the ground, and equipment availability, can play an important role.

What is the minimum depth of boreholes for shallow foundation?

The minimum depth of borehole for shallow foundation is 5m, or foundation width times a value ranging from 1 to 3.

Read more:

How to Setup Borehole Layout for Site Investigation of Different Foundations?

What are the Errors in Borehole Data Interpretation for Site Investigation?