I R C RECOMMENDATIONS FOR THE CBR METHOD OF DESIGN

Some of the important points recommended by IRC for the CBR method of design (IRC:37 – 1970) are given below:

A = P(1+r)(n+10).

Where A = Number of heavy vehicles per day for design (laden Weight>3 tonnes)

P = number of heavy vehicles per day at least count

r = annual rate of increase of heavy vehicles.

n = number of years between the last count and the year of completion of construction.