Concrete Discharge Time Requirements and Consequences of Exceeding Time Limit

Reading time: 1 minute

Concrete discharge time requirements ensures that hardened concrete would meet requirements set at design stage. It is the time available for placement of concrete in formworks after it has been mixed. When water is added to dry mixture, chemical reactions would occur. Water content declines as a result of chemical reactions and consequently concrete workability reduced with time. So, concrete should be discharged, placed, and compacted before it lost its workability. In this article, concrete discharge time requirements are discussed in addition to consequences of exceeding concrete discharge time limit.

What are the Time Requirements for Concrete Discharge?

Possible Consequences of Concrete Discharge Time Limit Violations