The Constructor

Inspection Checklists for Construction of Urban Stormwater System

Reading time: 1 minute

Checks that need to be carried at different stages of urban stormwater system construction includes checklist for excavation, trenching, pipes before application, pipe installation, gravel envelope, manholes, outlets, jacket crossing and backfilling. In this article, inspection checklist required during the urban storm water construction process are provided.

Fig.1: Stormwater System

Inspection Checklists for Construction of Urban Storm Water System

1. Excavation Checklist

Necessary checks required to be conducted during excavation include:

2. Trenching Checklist

3. Checklist for Pipes before Application

4. Pipe Installation Checklist

5. Gravel Envelope

6. Checklist for Manholes

7. Checklist for Outlets

8. Jacket Crossing Checklist

Before the start of jacking operation, During jacking operation After the jacking operation is completed, the following checks should be made,

9. Backfilling Checklist

Exit mobile version