Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

gAmE pLay - Questions

Home/ gAmE pLay/Questions
Ask gAmE pLay

Do you need to remove the ads? Get the paid membership

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Followed Questions
  • Favorite Questions
  • Posts
  • Comments
  • Groups

Discy Latest Questions

Asked: August 17, 2020In: Construction

How to Calculate the Area of formwork required for a Beam?

gAmE pLay
gAmE pLay

gAmE pLay

  • 1 Question
  • 1 Answer
  • 0 Best Answers
  • 22 Points
View Profile
gAmE pLay User

How to Calculate the Area of formwork required for a Beam? Calculate the area of the formwork required for a beam of 2 m span and cross-section dimension of 400 mm x 200 mm?

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on August 18, 2020 at 4:10 pm

    Formwork shall be measured in square metres as the actual surfaces in contact with the concrete The formwork or shuttering quantity for the member is measured as per the code of BIS - IS 1200:1982, Part 5- Method of Measurement of Building and Civil Engineering Works. For Column follow the process 1Read more

    Formwork shall be measured in square metres as the actual surfaces in contact with the concrete

    The formwork or shuttering quantity for the member is measured as per the code of BIS – IS 1200:1982, Part 5- Method of Measurement of Building and Civil Engineering Works.

    For Column follow the process

    1. Measure the four sides of column at base or in cross-section.

    2. Calculate the perimeter of column base.

    3. Measure the Colum height.

    4. Multiply the perimeter of base and height of column to give the shuttering area of column.

    Or other way, add all 4 sides and multiply it by height of column.

    For Beam follow the process

    1. Take the cross-section of beam and measure the lengths of the two sides and base of beam.

    2. Sum the three measurements.

    3. Measure the span of the beam

    4. Multiply the span length by sum of the three measurements (beam base two vertical sides) gives the shuttering area of beam.

    The top side in cross-section of beam is not considered as it will be part of beam.

    Or the other way, add the beam height(2 sides) and beam base and multiply it by beam length.

    Other important factors to be considered while picking the shuttering quantities.

    • Where formwork is required to be lined with wall board, hardboard, polythene sheet No deduction shall be made for openings up to 0.4sqm.
    • No deduction shall be made for any opening/cutouts when slip form technique is used.
    • Raking or circular cutting and rounded or moulded edges shall be measured in running meters. Moulded stopping shall be enumerated.
    • Formwork to secondary beam shall be measured up to the sides of main beams, but no deduction shall be made from the formwork of the main beams where the secondary beam intersects it.
    • Formwork to beam shall be measured up to sides of column, but no deduction shall be made from the formwork to stanchion or column casings at intersections of beam.

    Answer:

    Calculation:

    Cross section I terms of metres (400 200 mm) = 0.4  0.2 m

    Width and depth are given in cross section

    Area of the framework = (2 0.4 2) + (20.4  0.2) + (2  0.2)

    = 2.14 

    Result:

    The area of the formwork is = 2.14 .

    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 7
  • 4 4 Answers
  • 27,357 Views
  • 0 Followers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.