Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Kuldeep Singh - Questions

Home/ Kuldeep Singh/Questions
Ask Kuldeep Singh

Do you need to remove the ads? Get the paid membership

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Followed Questions
  • Favorite Questions
  • Posts
  • Comments
  • Groups

Discy Latest Questions

Asked: September 29, 2020In: Concrete

How to adjust mix proportions if we have to work with wet sand?

Kuldeep Singh
Kuldeep Singh

Kuldeep Singh

  • 1 Question
  • 110 Answers
  • 10 Best Answers
  • 652 Points
View Profile
Kuldeep Singh Learner

If we have wet sand and we don’t know the exact weight of dry sand, How do we adjust the w/c ratio and mix proportions?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 25, 2020 at 11:37 am

    If you are working with wet or moisture sand and without any tech then ; 1. Just weigh a sample of aggregate from inside your stockpile in a metal or other heat resistance receptacle.This must be a tare weight. 2. Place this sample in an oven or any heating material to remove moisture. 3. Again weigRead more

    If you are working with wet or moisture sand and without any tech then ;
    1. Just weigh a sample of aggregate from inside your stockpile in a metal or other heat resistance receptacle.This must be a tare weight.

    2. Place this sample in an oven or any heating material to remove moisture.

    3. Again weight the sample of aggregate.

    4. Subtract weight of 3 from 1 .

    5. When using aggregate from this stockpile for your concrete mix reduce water addition by weight determined in point 4 for each unit weight determined at 1 that you add.

    After this you will get to see water releasing from your aggregate. Also understand that the moisture content is most important on your sand less so in your course aggregate.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 3,545 Views
  • 0 Followers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.