The Constructor

STRUCTURE OF A GRAVITY DAM

Reading time: 1 minute

STRUCTURE (PARTS) OF A GRAVITY DAM

Heel: contact with the ground on the upstream side

Toe: contact on the downstream side

Abutment: Sides of the valley on which the structure of the dam rest

Galleries: small rooms like structure left within the dam for checking operations.

Diversion tunnel: Tunnels are constructed for diverting water before the construction of dam. This helps in keeping the river bed dry.

Spillways: It is the arrangement near the top to release the excess water of the reservoir to downstream side

Sluice way: An opening in the dam near the ground level, which is used to clear the silt accumulation in the reservoir side.

Exit mobile version