Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Muksit Pathan - Questions

Home/ Muksit Pathan/Questions
Ask Muksit Pathan

Do you need to remove the ads? Get the paid membership

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Posts
  • Comments
  • Groups

Discy Latest Questions

Asked: October 8, 2020In: Construction Site Related

What shall be the spacing for core cutter sample for dry density determination for each layer while constructing long embankment?

Muksit Pathan
Muksit Pathan

Muksit Pathan

  • 2 Questions
  • 0 Answers
  • 0 Best Answers
  • 28 Points
View Profile
Muksit Pathan User

While constructing long embankment (appx 4 km) in multiple layers of 300mm depth, what shall be spacing of core cutter samples to ensure adequate dry density measurement.

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 16, 2020 at 12:45 pm
    This answer was edited.

    Hi, There are not any specific criteria for the spacing of sample taken, and the decision is purely based upon site civil engineers and various criteria of soils and on observations. if you found soil which is less compacted or even is created then take samples for observation and check the bulk denRead more

    Hi, There are not any specific criteria for the spacing of sample taken, and the decision is purely based upon site civil engineers and various criteria of soils and on observations. if you found soil which is less compacted or even is created then take samples for observation and check the bulk density of soil and moisture content. Please refer to the following article for details about core cutter method and its applications: Link: https://theconstructor.org/geotechnical/dry-density-of-soil-by-core-cutter-method/2680/

    See less
    • 34
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 1,086 Views
  • 0 Followers
Asked: January 11, 2019In: Construction Site Related

What is height of instrument and Rise & fall method of levelling?

Muksit Pathan
Muksit Pathan

Muksit Pathan

  • 2 Questions
  • 0 Answers
  • 0 Best Answers
  • 28 Points
View Profile
Muksit Pathan User

I want to what is height of instrument and Rise & fall method of levelling? What is the method to calculate reduced level.

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on September 7, 2020 at 5:39 pm

    Height of Instrument : It is the method which deals with the obtaining of RL of the line of collimation by adding BS reading of a known RL point. Thus, RL of the line of collimation is called the Height of Instrument. It is always measured from the benchmark. Hence the benchmark is the point on theRead more

    • Height of Instrument :

    It is the method which deals with the obtaining of RL of the line of collimation by adding BS reading of a known RL point. Thus, RL of the line of collimation is called the Height of Instrument. It is always measured from the benchmark. Hence the benchmark is the point on the sea derived from mean sea level.

    – method to calculate RL;

    height of collimation (H of C) = reduced level(R.L.) + backsight (B.S.)

    reduced level (R.L.) = height of collimation (H of C) – foresight (F.S.)

    reduced level (R.L.) = height of collimation (H of C) – intermediate sight (I.S.)

     

    • Rise & fall method :

    It is the method which gives the difference of elevation between consecutive points by comparing each point after the first that immediately preceding it. Rise and fall are indicated by the difference in staff reading. After that RL is found by adding the rise to or subtracting the fall from the reduced level of the preceding point.

    – method to calculate RL;

    fall (F) = foresight (F.S.) – backsight (B.S.)

    fall (F) = intermediate sight (I.S.) – backsight (B.S.)

    rise (R) = backsight (B.S.) – foresight (F.S.)

    reduced level (R.L.) = precede reduced level  + rise (R)

    reduced level (R.L.) = precede reduce level – fall (F)

    See less
    • 45
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 11
  • 4 4 Answers
  • 94,007 Views
  • 0 Followers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.