Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

[email protected] - Answers

Home/ [email protected]/Answers
Ask [email protected]

Do you need to remove the ads? Get the paid membership

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Posts
  • Comments
  • Groups
  1. Asked: December 20, 2018In: Concrete

    fly Ash Percentage in PPC Cements

    vsandeep577@gmail.com

    [email protected]

    • 1 Question
    • 5 Answers
    • 0 Best Answers
    • 139 Points
    View Profile
    [email protected] Beginner
    Added an answer on June 14, 2020 at 7:21 pm

    Fly Ash is a product or furnace slag received form metal factories and power plants by burning or combustion of coal as fuel. The maximum percentage of fly ash or 15% by weight of cement shall be replaced by fly ash. #less percentage does not affect any properties of concrete or cement #more fly ashRead more

    Fly Ash is a product or furnace slag received form metal factories and power plants by burning or combustion of coal as fuel.

    The maximum percentage of fly ash or 15% by weight of cement shall be replaced by fly ash.

    #less percentage does not affect any properties of concrete or cement

    #more fly ash reduces the strength of concrete and durability of concrete.

    Adequate % of fly ash makes concrete economical and more durable.

    Because it reduces the quantity of cement, and slow hydration prevents cracks in concrete.

    Fly ash is available in the market cheaper than cement.

     

    See less
    • 4
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: December 2, 2017In: Construction Site Related

    What Software are used to Estimate Project Time and Quantity in Construction?

    vsandeep577@gmail.com

    [email protected]

    • 1 Question
    • 5 Answers
    • 0 Best Answers
    • 139 Points
    View Profile
    [email protected] Beginner
    Added an answer on May 29, 2020 at 7:43 pm

    For Project Planning & scheduling ,Time line & approximate Budget of project we can use Microsoft project and Primavera p6.

    For Project Planning & scheduling ,Time line & approximate Budget of project we can use Microsoft project and Primavera p6.

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Asked: May 28, 2020In: Construction

    What are the Types of Door Locks?

    vsandeep577@gmail.com

    [email protected]

    • 1 Question
    • 5 Answers
    • 0 Best Answers
    • 139 Points
    View Profile
    [email protected] Beginner
    Added an answer on May 29, 2020 at 7:42 pm

    There are many types of door locks- 1-Deadbolts 2-Knob lock 3-Mortise lock 4-Cam locks 5-Euro profile cylinder 6-Padlocks 7-Lever handle lock 8-Wall mounted lock 9-furniture lock 10-interchangeable core cylinder 11-Key in Knob cylinder 12-Rim latch lock 13-T-handle lock

    There are many types of door locks-
    1-Deadbolts
    2-Knob lock
    3-Mortise lock
    4-Cam locks
    5-Euro profile cylinder
    6-Padlocks
    7-Lever handle lock
    8-Wall mounted lock
    9-furniture lock
    10-interchangeable core cylinder
    11-Key in Knob cylinder
    12-Rim latch lock
    13-T-handle lock

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Asked: April 11, 2020In: Concrete

    How to Repair Damaged Beams and Walls in Load Bearing Construction?

    vsandeep577@gmail.com

    [email protected]

    • 1 Question
    • 5 Answers
    • 0 Best Answers
    • 139 Points
    View Profile
    [email protected] Beginner
    Added an answer on May 23, 2020 at 10:06 pm

    The first thing to is - 1-Avoid these type of  work/steps like breaking and cutting of structural members. 2-Choose an alternative option  or diversion. 3-if necessary to cut or break structural member than avoid cutting of reinforcement . 4-use needful precautions & methode. Methodes for repairRead more

    The first thing to is –

    1-Avoid these type of  work/steps like breaking and cutting of structural members.

    2-Choose an alternative option  or diversion.

    3-if necessary to cut or break structural member than avoid cutting of reinforcement .

    4-use needful precautions & methode.

    Methodes for repairs

    #divert this pipe by using 45 degree bend or sue bend and fill brick wall with brickbat and rich mortar and grout beam with finer aggregate concrete(using 6 to mm aggregate)

    #if above option is not possible than do plywood centring on wall face coveing pipe and cutout with support and grout as above, and plaster it using mesh on cutout and pipe surface.

     

    See less
    • -1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Asked: December 10, 2018In: Concrete

    How to calculate the quantity of water for a given concrete mix.?

    vsandeep577@gmail.com

    [email protected]

    • 1 Question
    • 5 Answers
    • 0 Best Answers
    • 139 Points
    View Profile
    [email protected] Beginner
    Added an answer on May 23, 2020 at 7:48 pm

    for Mix 1:2:4 water requirement would be- Plain concrete(moderate) The Minimum cement content for M15=240 kg/ m3 and min water cement ratio =water/cement =0.60 =water/240=0.60 Min water requirement for mix=240*.60=120 liters It is also depend upon climate condition,method of mixing and the purpose oRead more

    for Mix 1:2:4 water requirement would be-

    Plain concrete(moderate)

    The Minimum cement content for M15=240 kg/ m3

    and min water cement ratio =water/cement =0.60

    =water/240=0.60

    Min water requirement for mix=240*.60=120 liters

    It is also depend upon climate condition,method of mixing and the purpose of use.

     

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.