Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Trending Questions

Home/Trending Questions/Page 3

Do you need to remove the ads? Get the paid membership

Discy Latest Questions

Asked: September 8, 2020In: Structural Engineering

What is the introductory rate analysis of SS Masonry?

aviratdhodare
aviratdhodare

aviratdhodare

  • 37 Questions
  • 252 Answers
  • 0 Best Answers
  • 480 Points
View Profile
aviratdhodare

What is the introductory rate analysis of SS Masonry?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on November 20, 2020 at 3:47 pm
    This answer was edited.

    The rate analysis varies from place to place & it depends on the cost of construction material as well as labor cost. Roughly, we can say Ru. 134 per Cft. Required when PCC of 1:4:8 is used.

    The rate analysis varies from place to place & it depends on the cost of construction material as well as labor cost.

    Roughly, we can say Ru. 134 per Cft. Required when PCC of 1:4:8 is used.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 2 2 Answers
  • 1,951 Views
  • 0 Followers
Asked: September 22, 2020In: Construction

Mechanism of rotating tower lacated at Dubai?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

Mechanism of rotating tower lacated at Dubai ?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 28, 2020 at 11:19 pm
    Mechanism of rotating tower lacated at Dubai?

    Rotating Tower: Mechanism of rotating Tower: Mechanism of rotating Tower is very interesting to understand.  1)The whole steel structure is constructed with reference to Central Core and highly reinforced Foundation. 2)Driving system- every flower in the rotating Tower can be rotated around the centRead more

    Rotating Tower:

    Mechanism of rotating Tower:

    Mechanism of rotating Tower is very interesting to understand. 

    1)The whole steel structure is constructed with reference to Central Core and highly reinforced Foundation.


    2)Driving system- every flower in the rotating Tower can be rotated around the central Core which is connected by rails.


    3) Load cases: Different loads that are dead load life load wind load and earthquake loads are taken into account while designing the rotating Tower.


    4)Optimisation analysis: The stresses and deformation directly acting on the core of the rotating tower are very high.


    5)Alternative designs of the rotating tower:

    1. Alternative 1- Architects design
    2. Alternative 2- higher concrete grade
    3. Alternative 3- increased wall thickness
    4. Alternative 4- outrigger braced concrete Core
    5. Alternative 5- perimeter columns with Stiff floors

    6) Architect name:

    • RotatingTower is developed by the Italian architect David Fisher.

    7)  Shape of rotating Tower:

    • Because of the rotation of all floors can be possible independently, the building can transform into every different imaginable shape.

    8) Height of rotating Tower:

    • The original design of the rotating tower height is approximately 435 metre.

    9) Current need:

    • The current design of the stabilizing core of the rotating tower doesn’t intersect any essential need. Hence investigation of the structure according to the stiffness and strength is really very important parameter.

    10)Speciality of rotating Tower:

    • All the floors of the rotating tower can separately rotate with reference to the common axis located at the centre of the tower.
    • Rotating Tower is only one building in which it’s all floors can rotate 360-degree angle.
    • Every Apartment can spin individually in any direction

    See less
    • 35
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 2 2 Answers
  • 2,620 Views
  • 0 Followers
Asked: September 23, 2020In: Geotechnical Engineering

How can Artificial Intelligence be used in Geotechnical Engineering?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

How can Artificial Intelligence be used in Geotechnical Engineering?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 8, 2020 at 6:07 pm
    This answer was edited.

    Hi, Geotechnical engineering deals with materials (e.g., soil and rock) that, by their very nature, exhibit varied and behavior due to the physical processes associated with the formation of these materials. Modeling such materials' behavior is complicated and usually beyond the ability of most tradRead more

    Hi,

    Geotechnical engineering deals with materials (e.g., soil and rock) that, by their very nature, exhibit varied and behavior due to the physical processes associated with the formation of these materials. Modeling such materials’ behavior is complicated and usually beyond the ability of most traditional forms of physically-based engineering methods. Artificial intelligence (AI) is becoming more popular and particularly amenable to modeling most geotechnical engineering materials’ complex behavior because it has demonstrated superior predictive ability compared to traditional methods. Over the last decade, AI has been applied successfully to virtually every problem in geotechnical engineering. However, despite this success, AI techniques are still facing classical opposition due to some inherent reasons such as lack of transparency, knowledge extraction, and model uncertainty, which will discuss in detail in this chapter. Among the available AI, techniques are artificial neural networks (ANNs), genetic programming (GP), evolutionary polynomial regression (EPR), support vector machines, M5 model trees, and K-nearest neighbors (Elshorbagy et al.,2010). This chapter will focus on three AI techniques, including ANNs, GP, and EPR. 

    See less
    • 40
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 2 2 Answers
  • 1,500 Views
  • 0 Followers
Asked: September 25, 2020In: Construction

What is the correct procedure of designing surplus weir in irrigation?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

Give the correct procedure of designing surplus weir.

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on September 28, 2020 at 11:36 pm

    Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank. Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplRead more

    Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank.

    Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplus weir. Fixation of this level depends on the availability/demand of water.

    Max water level (MWL): It is the max level of water allowed in the tank. MWL is higher than FTL. The difference between MWL & FTL is the spillage or head on crest of surplus weir Fixation of this level depends on the submergence of land due to back water.

    Tank bund level (TBL): It is the top level of the liqd of the bund & is equal to MWL + freeboard.

    Abutment: The walls that flank the edge of a weir and which support the banks on each side of the weir. The length of the abutment is generally kept same as the base width of weir. The top level of the abutment is kept at tank bund level.

    Wing wall: A wall on a weir that ties the structure into the bank in continuation of the abutments. Wing walls are provided both on the u/s and d/s sides on both the banks to ensure smooth entry and exit of water away from the tank.

    Return wall (Return): These are provided at right angles to the abutment at the end of wing wall and extend into the banks to hold the back-fill.

    Splay: Horizontal deviation of wall. Ex: 1 in 3, 1 in 5, etc.

    Batter: Vertical deviation of wall. Ex: 1 in 8, 1 in 12, etc.

    Hydraulic gradient, Saturation gradient (or) Seepage gradient: It is the head loss
    (energy loss) per unit length in the direction of flow traveled by water particle through soil. Ex: Saturation gradient 4:1, it means to dissipate energy of 1m, water should travel a distance of 4 m in the soil

    Catchment area(watershed area, drainage area, drainage basin or basin or
    catchment): It is a portion of land which catches the rain and produces runoff through a one outlet.

    Free catchment: Entire runoff in the catchment will be passed direct to tank. It means water from catchment area is not go to other tank or channels, and it should directly goes to one tank.

    Intercepted catchment: Part of runoff will be intercepted and stored by the u/s side tank(s) within the catchment.

    Combined catchment: Entire runoff in the catchment will be shared by group of tanks or a chain of tanks which comes under the same catchment.

    D/S Apron of the surplus weir: Depending upon the foundation particulars, and the levels of U/S and D/S ground at the location of the work, any one of the following types can be adopted.

    Type A → Horizontal masonry apron – when fall height < 75 cm

    Type B → Sloping apron

    Type C → Similar to B but with rough stone sloping

    Type D → Stepped apron – when fall height ⩾ 75 cm

    Location of surplus weir: It is desirable to locate the surplus weir at or near the flank of the tank bund and connected to it, and also at a place where it is possible to drain the surplus waters below the work away from the tank bund falling into its natural watercourse. The cost of works should be minimum.

    Design a surplus weir for a minor tank forming a group of tanks with the following data:
    Combined catchment area                                                      = 25.89 km2 (35 km2)
    Intercepted catchment area                                                   = 20474 km2 (10 km2)
    Top width of the bund                                                             =2m (2m)
    Side slopes of the bund                                                           = 2:1 both sides (2:10n both sides)
    Top level of bund                                                                      = +1450 (+ 12.50)
    Maximum Water Level (MWL)                                             =+ 12.75 (+ 10.75)
    Full Tank Level (FTL)                                                              = + 12.00 (+ 10.00)
    General ground level at the site                                             =+ 11.00 (+ 9.00)
    Ground level slopes off to a level in about 6 m distance) = + 10.00 (+ 8.00 in about 6 m dist)
    The foundations are of hand gravel                                      = + 9.50 (+ 7.50)
    Saturation gradient                                          = 4:1 with 1 m clearcover (4:1 with 1m clearcover)
    Provision is to be made to store water up to MWL in-times of necessity

    Components to be designed

    (1) Estimation of flood discharge entering the tank (Q) :
    Combined catchment area (M) # 25.89 km2
    intercepted catchment area (m) = 20.71 km2
    Assuming Ryve’s coefficient(C) =9 and c = 1.5
    Flood discharge (Q) = CM2/3 – cm2/3
    Q = 9 (25.89)2/3 — 1.5 (20.71)2/3 = 78.77 — 11.32
    Q = 67.45 m3/s

    (2) Length of surplus weir (L):
    Assuming the flow over a surplus weir is identical to that of flow over a rectangular weir then discharge is given by Q = 2/3 CdL √2g h3/2
    where, Q = 67.45 m3/s, cd = 0.562 (assuming), g = 9.841 m/s2
    h = MWL – FTL = 12.75 — 12.00 = 0.75 m, L — Length of the water way
    67.45 = 2/3 x 0.562 x L √2×9.81 (0. 7s)3/2 → L=62.75 m ≈ 63.00 m (say)
    Since temporary regulating arrangements are to be made on top of weir to store water at times of necessity.
    The dam stones of size 15 x 15 x 125 cm are at 1m clear internals keeping top of the stone at M.W.L.
    The no. of openings will be = 63, The no. of dam stones required = 62
    ∴ The overall length of surplus weir between abutments = 63 + (62 x 0.15)
    = 72.30 m
    However, provide an overall length of 75 m.

    (3) Height of the weir (H):
    Crest Level = FTL = +12.00
    Top of dam stones (top of shutters) = M.W.L = + 12.75
    Ground level = + 11.00
    Hard soil at the foundation is + 9.50.
    However, taking foundations about 0.50 m deep into hard soil and fix up foundation level at + 9.00
    Assuming foundation concrete is 60 cm thick
    Top of foundation concrete = + 9.60
    Height of weir above foundations (H) = 12.00 – 9.60 = 2.4m

    (4) Crest width of weir (a):
    a = 0.55 (√H + √h) = 0.55(√2.4 + √0.75) = 1.3m

    (5) Base width of weir (b):
    The base width is determined based on moment considerations. i.e., based on the magnitude of stabilizing and destabilizing moments.
    Stabilizing moments are caused by self weight of the weir which is given by
    M = γw /12 = [{(G+15)H + 2.5S}b2 + a(GH – H – S)b – ½a2 (H +3S)]
    Where, γw = Unit weight of water = 1000 kg/m3
    G = Specific gravity of masonry = 2.25
    H = Height of the weir = 2.40 m
    a = Crest width of weir = 1.30 m
    b = Base width of the weir = ?
    S = h = height of shutter above weir crest = 12.75 – 12.00 = 0.75 m
    Destabilizing moments (M,)
    Mr = γw (H + S)3 / 6
    Equating both the moments: M,=M
    Mr = (2.4 + 0.75)3 / 6 = 1 /12 [{2.25 + 1.5)2.4 + 2.5 x 0.75} b2 + 1.3 (2.25 x 2.4 – 2.4 – 0.75)b – ½ (1.3)2 (2.4 + 3 x 0.75)]
    Solving, b = 2.4 m

    (6) Abutments, Wing walls and Returns:
    The top width of abutments, wing walls & returns will all be uniformly 0.50 m with a front batter of 1 in 8. Diag in attachment.
    Abutment (AB)
    Length of the abutment = width of bund = 2m
    The top level of the abutment is kept at TBL = + 14.50
    Bottom level of the abutment = top of foundation level = + 9.60
    Height of the abutment = 14.50 — 9.60 = 4.90 m
    Bottom width= 0.4 x height = 0.4 x 4.90 = 1.96 m = 2.00 m (say)
    Top width 2 0.5 m (assuming), Front batter = 1 in 8
    Wing walls:
    U/S Wing Wall:
    BD is called u/s wing wall
    Section at B:
    Same as the section of abutment
    Wing wall from B to C is sloping and
    Top level of C = M.W.L + 30 cm = 12.75 + 0.30 = 13.05
    Section at C:
    Top Level at C = 13.05
    Bottom level = 9.60
    Height of wing wall = 13.05 – 9.60 = 3.45 m
    Bottom width = 0.4 x height = 0.4 x 3.45 = 1.38 = 1.40 m (say)
    Top width from B to C is the same as 0.5 m.
    But, bottom width gets slowly reduced
    from 2.00 m at section at B to 1.40 m at Section C:
    From C to D wing wall is horizontal. Therefore, Section at D = Section at C
    U/S Return (DE):
    Section at E = Section at D
    U/S transition:
    In order to give an easy approach, the u/s side wing wall may be splayed at 1 in 3.
    D/S wing wall:
    AF is called d/s wing wall.
    Section at A: Same as the section of abutment. The Wing wall from A to F will slope down till the top reaches the ground level at F.
    Section at F:
    Top of wing wall at F = + 11.00
    Bottom of wing wall = + 9.60
    Height = 11.00 – 9.60 = 1.40 m
    Bottom width = 0.4 x 1.4 = 0.56 m
    However, provide a minimum of 0.6 m
    D/S return (FG):
    The same section at F is continued for FG also
    D/S transitions:
    Provide a splay of 1 in 5.

    (7) Aprons of the weir:
    i). U/S Apron: Though apron is not required on the u/s side of the weir, a puddle clay apron is usually provided to minimize the seepage under the weir.
    ii).D/S Apron: Since the ground level is falling down to +10.00 in a distance of about 6m. Then, the fall is (12.00 – 10.00) = 2.00 m > 0.75 m therefore provide a stepped apron (Type D) Diagram in attachment. The stepping may be done in two stages.
    (a) The length of the Apron: The length of the apron should be adequate to avoid piping problem.
    [Maximum uplift will be occurred when water level on U/S is up to top of dam stone (M.W.L.) and no water on D/S (+10.00))
    Max. Uplift head = 12.75 – 10.00 = 2.75 m (max. energy to be dissipated)
    Assuming a hydraulic gradient of 1 in 5
    The length of the creep required = 2.75 x 5 = 13.75 m
    The length and thickness of apronts to be designed.
    The length of the creep = AB + BC + CD + DE + EF = 1.40 + 0.60 + 3.00 + DE + 1 (Assuming EF = 1 m)
    This length should not be less than 13.75 m, if the structure is to be safe.
    13.75 = 1.40 + 0.60 + 3.00 + DE + 1 → DE = 7.75 m = 8.0 m (say)
    Provide total length of solid apron ts 8 m.
    First step in 3 m and second step in 5 m length.
    (b) Thickness of solid apron: The maximum uplift on the apron is felt immediately above the point D. (i.e., at point K)
    Assuming the thickness of apron at point K = 80 cm = 0.80 m.
    Then the level of K = 11.00 – 0.80 = 10.20
    The length of the creep from A to K = 1.4 + 0.6 + 3 + 0.6 + (10.20 – 9.60) = 6.20 m
    Head loss in percolation along the path up to the point K = 6.20/5 = 1.24 m
    Residual head exerting uplift under the apron at point K = 2.75 – 1.24 = 1.51 m
    Thickness of apron required = Residual head / Sp. gravity = 1.51/2.25 = 0.67 m
    Provide 20% of more thickness as a safety
    Then thickness of apron required = 0.80 m
    So, provide the first solid apron as 80 cm thick.
    The second apron can be similarly checked for a thickness of 50 cm.

    8) Talus: At the end of d/s side apron, a nominal 3 to § m length of Talus (i.e., rough stone apron) with a thickness of 50 cm may be provided as a safety mechanism.

     

    See less
    • 36
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 1 1 Answer
  • 6,508 Views
  • 0 Followers
Asked: September 29, 2020In: Construction

What should be the standard dimension of ventilator in home?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

What should be the standard dimension of ventilator in home?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 5:52 pm

    Thank you everyone.

    Thank you everyone.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 3 3 Answers
  • 7,278 Views
  • 0 Followers
Asked: September 23, 2020In: Concrete

What is the range of density of Carbon Fibre in Conductive Concrete?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

What is the range of density of Carbon Fibre in Conductive Concrete?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 28, 2020 at 11:25 pm
    What is the range of density of Carbon Fibre in Conductive Concrete?

    Conductive carbon fiber reinforced concrete is a self-heating material specially used for prevention against ice formation. Following are the specification of Carbon fibre used in conductive concrete; Density-1.81 g/cm 3 Diameter- 7.2 micron Carbon Content-95% Tensile Strength-3800MPa Elastic ModuluRead more

    Conductive carbon fiber reinforced concrete is a self-heating material specially used for prevention against ice formation.


    Following are the specification of Carbon fibre used in conductive concrete;

    1. Density-1.81 g/cm 3
    2. Diameter- 7.2 micron
    3. Carbon Content-95%
    4. Tensile Strength-3800MPa
    5. Elastic Modulus-242GPa
    6. Resistivity-1.52 x 10^3

    See less
    • 35
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 3 3 Answers
  • 2,675 Views
  • 0 Followers
Asked: September 19, 2020In: Miscellaneous

how to calculate the rate of spray of prime coat in road construction.

aviratdhodare
aviratdhodare

aviratdhodare

  • 37 Questions
  • 252 Answers
  • 0 Best Answers
  • 480 Points
View Profile
aviratdhodare

 how to calculate the rate of spray of prime coat in road construction. 

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on September 25, 2020 at 4:08 pm

    Tray Test is used to calculate the rate of spread of prime or tack coat. The test uses a 20cm X 20 cm X 3 cm tray placed on the surface to be primed at some intervals in the path of the sprayer/emulsion distributor. They are placed between the wheel's path/tracks. 5 samples are collected for a testRead more

    Tray Test is used to calculate the rate of spread of prime or tack coat. The test uses a 20cm X 20 cm X 3 cm tray placed on the surface to be primed at some intervals in the path of the sprayer/emulsion distributor. They are placed between the wheel’s path/tracks.

    5 samples are collected for a test and a minimum of 3 tests are conducted for a day of work.

    Weight of the emulsion on the tray is calculated by finding the difference in the final and the initial weight of the tray. Weight per unit sq.m or weight per 10 sq.m is obtained and checked with specified limits mentioned in MORT&H Table 500–3 (prime coat) and 500–5 (Tack coat) or other relevant IRC specifications.

    Initially before the start of the priming work, a demonstration trial is done based on the following parameters:

    1. Equipment type for spraying operation
    2. Size of nozzle
    3. Pressure at spray bar
    4. Speed of forward movement of sprayer equipment.

    Above values are ascertained and calibrated for a required rate of spray as per the specification by using tray test prior to the start of actual work.

    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 2 2 Answers
  • 26,145 Views
  • 0 Followers
Asked: September 22, 2020In: Foundation

In which type of soil can we use pile foundation?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

explain briefly about pile foundation and in which type of soil it can be used?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on November 21, 2020 at 5:48 pm
    This answer was edited.

    Pile foundations are habitually used for large structures and in certain situations where the soil at shallow depth is unsuitable to withstand excessive settlement & resist uplift. Thank You.

    Pile foundations are habitually used for large structures and in certain situations where the soil at shallow depth is unsuitable to withstand excessive settlement & resist uplift.


    Thank You.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 32
  • 2 2 Answers
  • 1,464 Views
  • 0 Followers
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.