Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

dbnalawade - Best Answers

Home/ dbnalawade/Best Answers
Ask dbnalawade

Do you need to remove the ads? Get the paid membership

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Followed Questions
  • Favorite Questions
  • Posts
  • Comments
  • Groups
  1. Asked: August 2, 2020In: Construction Site Related

    What are the best steps for checking reinforcement in R.C.C structure?

    dbnalawade

    dbnalawade

    • 15 Questions
    • 24 Answers
    • 2 Best Answers
    • 1,086 Points
    View Profile
    dbnalawade Expert
    Added an answer on August 4, 2020 at 10:45 am

    Very important question before providing clearances to pour concrete. I would follow following steps. Ensure Contractor has bar bending schedule and approved drawing. Ensure reinforcement used are approved grade and test certificates are in place. Check  diameter of rebar ( reinforcement) Check spacRead more

    Very important question before providing clearances to pour concrete. I would follow following steps.

    1. Ensure Contractor has bar bending schedule and approved drawing.
    2. Ensure reinforcement used are approved grade and test certificates are in place.
    3. Check  diameter of rebar ( reinforcement)
    4. Check spacing
    5. Check banding radius
    6. Check number of bars
    7. Check laps are of proper length. Some time couplers are used to join the reinforcement. Couplers must be approved.
    8. Check proper cover to rebar is in place.
    9. Covers should be approved
    10. Check the reinforcement installed does not sag  or move. For this ensure you use chairs.
    11. Tie the rebars together using soft annealed lining wire and turn the know inside.
    12. Reinforcement must be clean without any dirt or coating.
    13. Some time special reinforcement steel is provided around openings. Ensure this is in place.
    14. It is normal for QC departments to use check lists for this.

    Hope this helps.

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: April 27, 2019In: Foundation

    What is the Procedure for Foundation Construction of a Building?

    dbnalawade

    dbnalawade

    • 15 Questions
    • 24 Answers
    • 2 Best Answers
    • 1,086 Points
    View Profile
    dbnalawade Expert
    Added an answer on July 30, 2020 at 2:18 pm

    Step by Step procedure for construction of building foundation on an organised construction site can be as below: First step is to write a method statement involving scope of work, references, count and type equipments and labour required and requirements . Ensure you have  approved drawings good foRead more

    Step by Step procedure for construction of building foundation on an organised construction site can be as below:

    1. First step is to write a method statement involving scope of work, references, count and type equipments and labour required and requirements .
    2. Ensure you have  approved drawings good for construction
    3. Prepare BBS for foundations and order reinforcement and ensure materials are on site and correctly stored.
    4. Request survey department to mark foundation centrelines and sizes including working space.
    5. Perform excavation manually or using machines depending on depth, nature of soil and water table. Some time you may to resort to dewatring to keep the water well below the foundation level.
    6. Do not over excavate . Any over excavation should be made top by lean concrete.
    7. Do not expose the foundation level for long time time. Ensure lean concrete is poured as soon as foundation level is reached .
    8. Inspect the foundation level for loose material or soft patches.
    9. Lean concrete is normally 75mm in thickness
    10. Following PCC or lean concrete, install reinforcement including column reinforcement or dowels and shutter the foundation. Use concrete covers of required size at the bottom and sides of reinforcement.
    11. In Middle East they introduce waterproof membranes ( refer: Grace Products)on lean concrete which raps the entire foundation as protection ( also known as tanking)
    12. Once the rebar is in place , with cover you need dust off and get the foundation inspected.
    13. Concrete Pour Card provides you all the checks you need to perform before casting foundations.
    14. You order correct grade concrete + check slump+temperature before concrete is allowed to be poured.
    15. Compact the concrete in layers using vibrators without leading to segregation.
    16. Cast the cubes to test at 7 and 28 days
    17. Cure the cast concrete for minimum of 10 days if it is wet curing
    18. Deshuttering of vertical faces is normally 24 hour to 48 hours.
    19. Once deshuttered and cured foundation is provided with coating or membrane protection.
    20. Finally foundations are backfilled by selected approved fill material in layers of 200mm or less to 95% degree.

    Hope this helps.

     

    See less
    • -3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.