Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Interview Questions

Home/Interview Questions/Page 3

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random
  1. Asked: July 27, 2020In: Interview Questions

    What is the difference between Nappe and Jet?

    Himanshu joshi

    Himanshu joshi

    • 11 Questions
    • 27 Answers
    • 0 Best Answers
    • 767 Points
    View Profile
    Himanshu joshi Learner
    Added an answer on July 28, 2020 at 10:05 pm

    The sheet of water flow that flows over weir or dam is known as nappe. The sheet of water that flows from the orifice is known as jet.

    The sheet of water flow that flows over weir or dam is known as nappe.
    The sheet of water that flows from the orifice is known as jet.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: July 22, 2020In: Interview Questions

    What is the best answer for ”Why did you choose Civil Engineer?

    Tips_and_tricks

    Tips_and_tricks

    • 13 Questions
    • 15 Answers
    • 1 Best Answer
    • 685 Points
    View Profile
    Tips_and_tricks Learner
    Added an answer on July 22, 2020 at 6:19 pm

    My answer would be, "Food, clothes, and shelter are the basic necessities of mankind. Civil engineering provides one of the three basic necessities. I also chose civil engineering because it is the most practical branch of civil engineering. It gives life to the drawings. The satisfaction of lookingRead more

    My answer would be, “Food, clothes, and shelter are the basic necessities of mankind. Civil engineering provides one of the three basic necessities. I also chose civil engineering because it is the most practical branch of civil engineering. It gives life to the drawings. The satisfaction of looking at your drawings and designs getting life and standing up tall can not be compared to any other form of pleasure!”

    See less
    • 5
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Asked: July 20, 2020In: Interview Questions

    What is best answer of “Introduce Yourself”?

    INDER KUMAR YADAV

    INDER KUMAR YADAV

    • 0 Questions
    • 14 Answers
    • 1 Best Answer
    • 562 Points
    View Profile
    INDER KUMAR YADAV Learner
    Added an answer on July 21, 2020 at 10:46 pm

    I think that you can the following steps:- Greet the interviewer (mainly if there is a women interviewer then you should greet her first then you can greet all other member) this step will show show your etiquettes. Tell them your name and tell them about your current status (student or job) Tell thRead more

    I think that you can the following steps:-

    1. Greet the interviewer (mainly if there is a women interviewer then you should greet her first then you can greet all other member) this step will show show your etiquettes.
    2. Tell them your name and tell them about your current status (student or job)
    3. Tell them about your birth place.
    4. Tell them about your hobbies but tell them the real one because mainly the question are asked from this area
    5. Tell them about your strength.
    6. Tell them about the area of interests and continue these till the interviewer stops you.
    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Asked: July 17, 2020In: Interview Questions

    Explain Arch Dam and Buttress Dam?

    vivek gami

    vivek gami

    • 54 Questions
    • 16 Answers
    • 5 Best Answers
    • 93 Points
    View Profile
    vivek gami User
    Added an answer on July 20, 2020 at 11:12 am

    arch dam is constructed when dam abutment has rocky strata and have higher bearing capacity to resist trust from arching action of an arch dam. see arch dam in figure it is constructed when river run between two hills and the dam site has great depth, and less width at that location arch dam is veryRead more

    arch dam is constructed when dam abutment has rocky strata and have higher bearing capacity to resist trust from arching action of an arch dam.

    see arch dam in figure

    it is constructed when river run between two hills and the dam site has great depth, and less width at that location arch dam is very economical to another type of dam.

    buttress dam is a dam in which has straight alignment and which have buttressed support on the downstream side.

    buttress is provided to additional support of dam structure .

    the main purpose of the buttress is to provide additional safety against the overturning of the dam. this type of dam is constructed at where dam height is high.

     

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Asked: July 19, 2020In: Interview Questions

    What is the meaning of kick-off meeting?

    DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 19, 2020 at 9:30 pm

    The reason for the kickoff meeting is to officially notify all partners that the project has started and ensured everybody has a typical comprehension of the undertaking and his job. The kickoff meeting is a chance to get all the colleagues, clients, and stakeholders together and officially set up fRead more

    The reason for the kickoff meeting is to officially notify all partners that the project has started and ensured everybody has a typical comprehension of the undertaking and his job. The kickoff meeting is a chance to get all the colleagues, clients, and stakeholders together and officially set up for the beginning of the project. Like every official meeting, there ought to be a plan. There are various explicit things you need to cover at this meeting:

    • Introduce the people at the meeting.
    • Recap the information in the Project Charter, including:
      • The purpose of the project
      • Scope
      • Major deliverables
      • Risks
      • Assumptions
      • Estimated effort and budget
      • Deadline

    Examine the significant jobs and duties of the undertaking group, clients, and stakeholders. Many, if not the entirety of the individuals that will take a shot at the undertaking, ought to be in attendance.

    Go over the general methodology and course of events of the venture. This gives individuals a sense of how the undertaking will unfold. Specifically, you will need to guarantee that individuals comprehend what they should do in the present moment to help the undertaking.

    Talk about and answer any exceptional inquiries. The reason for the conversation isn’t to reiterate the motivation behind the venture, however, to permit individuals to voice specific queries or concerns they have as the task starts.

    Affirm that the task is currently in progress. On the off chance that the undertaking has not begun at this point, it should now be prepared to start right away.

    Different things to consider in the kickoff meeting include:

    Participants. By and large, the undertaking group, clients, and stakeholders ought to be in participation. If these outcomes in such a large number of individuals for comfort, you can consider having just the significant players join in. You would then be able to meet with others in resulting smaller than usual kickoff meetings, or you can send the meaningful meeting data to the individuals who couldn’t join in.

    Length. Although most kickoff meetings can be directed in an hour or two, others may require a day or two. The longer kickoff meetings are particularly significant if the undertaking is extremely perplexing or dubious. Now and again, a long kickoff meeting might be valuable as an approach to assemble starting prerequisites, although that would not be the primary role.

    Preparation. It is said you never have another opportunity to establish a decent first connection. This is valid with the kickoff meeting. You are utilizing the meeting to help set desires for the undertaking. If the meeting is unorganized, chaotic, or a waste of time, the members will likely convey those discernments into the task also. The task director needs to ensure that he has arranged well for this meeting and that it goes easily. The undertaking administrator ought to likewise converse with the support early and settle on sure that they are in concurrence with how the meeting will advance.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  6. Asked: July 17, 2020In: Interview Questions

    What is the difference between ductile and malleable property of material?

    Vivek Patel

    Vivek Patel

    • 39 Questions
    • 80 Answers
    • 1 Best Answer
    • 6 Points
    View Profile
    Vivek Patel User
    Added an answer on July 19, 2020 at 12:54 pm

    Malleability is a related to ductility, Malleability is a property, which thin sheet can be formed by hammering and rolling very easily. When ductility is ability to deform of material when tensile force is applied to that material.   Another different given below Malleability It is measured byRead more

    Malleability is a related to ductility,

    Malleability is a property, which thin sheet can be formed by hammering and rolling very easily.

    When ductility is ability to deform of material when tensile force is applied to that material.

     

    Another different given below

    Malleability

    • It is measured by ability to withstand against pressure
    • Affected by crystal structure of material
    • Basically this term use in compression stress
    • This property give idea about pressure resistance without failure

     

    Ductility

    • It is measured by bend test
    • Affected by grain size of material
    • Basically this term use in tensile stress
    • This property give idea about bending resistance without failure
    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  7. Asked: July 16, 2020In: Interview Questions

    What is full form of SP in Indian standard code?

    DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 16, 2020 at 4:11 pm

    Special Publications  

    Special Publications

     

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  8. Asked: June 20, 2020In: Interview Questions

    Which are the methods for the demolition of any structure?

    Ancy Joby

    Ancy Joby

    • 20 Questions
    • 11 Answers
    • 1 Best Answer
    • 580 Points
    View Profile
    Ancy Joby Learner
    Added an answer on July 5, 2020 at 5:25 pm

    Demolition methods are chosen based on several factors.It depends on type of material used in building, based on location of building, waste disposal etc... Widely used demolition across the world are as follows 1. Implosion 2. Selective Demolition 3. Wrecking ball demolition 4. Mechanical demolitioRead more

    Demolition methods are chosen based on several factors.It depends on type of material used in building, based on location of building, waste disposal etc…
    Widely used demolition across the world are as follows

    1. Implosion
    2. Selective Demolition
    3. Wrecking ball demolition
    4. Mechanical demolition
    5. High Reach Arm Demolition

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
Load More Answers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.