Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

how to calculate the rate of spray of prime coat in road construction.

Home/ Questions/Q 47493
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: September 19, 20202020-09-19T23:02:47-07:00 2020-09-19T23:02:47-07:00In: Miscellaneous
aviratdhodare
aviratdhodare

aviratdhodare

  • 37 Questions
  • 252 Answers
  • 0 Best Answers
  • 480 Points
View Profile
aviratdhodare

 how to calculate the rate of spray of prime coat in road construction. 

  • 33
  • 2 2 Answers
  • 26,170 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

2 Answers

  • Voted
  • Oldest
  • Recent
  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    2020-09-25T16:08:16-07:00Added an answer on September 25, 2020 at 4:08 pm

    Tray Test is used to calculate the rate of spread of prime or tack coat. The test uses a 20cm X 20 cm X 3 cm tray placed on the surface to be primed at some intervals in the path of the sprayer/emulsion distributor. They are placed between the wheel’s path/tracks.

    5 samples are collected for a test and a minimum of 3 tests are conducted for a day of work.

    Weight of the emulsion on the tray is calculated by finding the difference in the final and the initial weight of the tray. Weight per unit sq.m or weight per 10 sq.m is obtained and checked with specified limits mentioned in MORT&H Table 500–3 (prime coat) and 500–5 (Tack coat) or other relevant IRC specifications.

    Initially before the start of the priming work, a demonstration trial is done based on the following parameters:

    1. Equipment type for spraying operation
    2. Size of nozzle
    3. Pressure at spray bar
    4. Speed of forward movement of sprayer equipment.

    Above values are ascertained and calibrated for a required rate of spray as per the specification by using tray test prior to the start of actual work.

    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Shreesh Shrivastav Dept of Civil Engineering

    Shreesh Shrivastav Dept of Civil Engineering

    • 0 Questions
    • 1 Answer
    • 0 Best Answers
    • 30 Points
    View Profile
    Shreesh Shrivastav Dept of Civil Engineering User
    2020-09-22T13:53:50-07:00Added an answer on September 22, 2020 at 1:53 pm

    Steps to measure the rate of Spray of Prime Coat in Road Construction are:

    1. You have to take sample tray of suitable size. I would prefer use tray of Size 35 cm * 28 cm.
    2. Weight the tray in weighing balance. Say initial weight of tray= A kg
    3. Place the tray over the road on which prime coat is to be sprayed and hence the prime coat is sprayed over the tray.
    4. Let the prime coat dry for some time and weight the tray over which prime coat is sprayed. Say Final weight of Tray(with the prime coat)= B kg
    5. Calculations to be done:
    6. Area of tray = 0.35 *0.28 =0.098 sq/m
    7. Initial Weight of Tray= A kg
    8. Final Weight of Tray= B kg
    9. Specific Gravity of Prime Coat= 0.95
    10. Calculate increase in Weight= (B-A) kg
    11. Rate of Spray in Kg = (Increase in Weight)/(Area of tray)
    12. Unit of Rate of Spray in kg/sqm.(Kilogram per square meter)
    • 4
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.