Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

How to Check and Maintain Slopes of Pipes and Drains at Construction Sites?

Home/ Questions/Q 18747
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: October 17, 20172017-10-17T13:51:08-07:00 2017-10-17T13:51:08-07:00In: Construction Site Related
Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 75 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

How the slope system in pipes and drains works and how to check and maintain the same at construction sites? What are the methods for the same? What is the mean of 1:4 slope for pipes and drains?

  • 4
  • 1 1 Answer
  • 6,792 Views
  • 0 Followers
  • 2
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

1 Answer

  • Voted
  • Oldest
  • Recent
  1. Gopal Mishra

    Gopal Mishra

    • 75 Questions
    • 44 Answers
    • 7 Best Answers
    • 577 Points
    View Profile
    Gopal Mishra
    2017-10-17T19:23:15-07:00Added an answer on October 17, 2017 at 7:23 pm

    Slopes in pipes and drains are decided by quantity of water or wastewater to be transported through it by the action of gravity in cumecs. Following things influence the slopes of drains and pipes:

    1. Quantity of water to be transported

    2. Size or diameter of the pipe

    3. Distance the water to be carried

    4. Velocity or the pressure required for the water at the outlet, if any

    Slopes of drains and pipes at construction site is checked by dumpy level or level machines. For the same, you have to calculate depth of pipes at different intervals.

    Suppose, 1:4 slope of the pipe is required as per drawing (as mentioned by you), then the depth of pipe at should have a difference of 1 m from start of the pipe to the end of pipe at 4m. If you want to know the depth of pipe at 2m length, then it will be half of the end position, i.e. 0.5m. These are calculated based on triangle.

    Slopes are always mentioned w.r.t. a reference point. Consider your reference point as a levelled surface. Then length of the pipe required will be length of the triangle, base will be the depth required from the start to end of the pipe. Now you can divide the triangle at different point and calculate the depth required at different locations of the pipeline or drain system.

    I will provide your more details with figures soon.

    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.