What are Different Stages of Construction and requirements of Building Material like Steel Bar Size, Cement, Sand and Aggregate

Question

Sir,
I request you to mention the material requirement for the following works :

  1. R.C.C COLUMN ( Size of TMT steel & Mix of cement:Sand:aggregate)
  2. TIE BEAM( Size of TMT steel & Mix of cement:Sand:aggregate)
  3. ERECTION OF COLUMN ( Size of TMT steel & Mix

of cement:Sand:aggregate)

  1.   REINFORCEMENT WORK FOR 1ST. FLOOR SLAB ( Size of TMT steel

& Mix of cement:Sand:aggregate)

  1. 2ND. FLOOR COLUMN ERECTION ( Size of TMT steel & Mix

of cement:Sand:aggregate)

  1. STAIR FOR 2ND. FLOOR / ROOF ( Size of TMT steel & Mix

of cement:Sand:aggregate)

7. Lintel ( Size of TMT steel & Mix of cement:Sand:aggregate)

0
3 months 0 Answers 473 views 1

Leave an answer

Sorry, you do not have a permission to answer to this question .