Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What is Formula to Decide the Termination Depth of the Pile?

Home/ Questions/Q 40652
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: May 14, 20202020-05-14T22:39:50-07:00 2020-05-14T22:39:50-07:00In: Structural Engineering
poojan
poojan

poojan

  • 5 Questions
  • 14 Answers
  • 1 Best Answer
  • 604 Points
View Profile
poojan Learner

When do we decide that pile can now be terminated, of course there is depth given in the structural details but along with that there are some criteria to measure on-site if it is not fulfilled than you have to drill deeper than mentioned in the plan. What are the formula and criteria?

  • 0
  • 1 1 Answer
  • 5,522 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

1 Answer

  • Voted
  • Oldest
  • Recent
  1. Madeh Izat Hamakareem

    Madeh Izat Hamakareem

    • 0 Questions
    • 40 Answers
    • 3 Best Answers
    • 1,229 Points
    View Profile
    Madeh Izat Hamakareem
    2020-08-01T17:33:25-07:00Added an answer on August 1, 2020 at 5:33 pm

    Pile penetration ratio and chisel energy level are two methods that are used to decide on the termination of pile depth in the construction site:

    1. Pile Penetration Ratio (PPR) for Rotary Piling

    Equation for the determination of pile termination point in construction site:

    PPR=(2⋅π⋅N⋅T⋅t)/(A⋅d)                           Equation 1

    PPR: Pile penetration ratio, kN m/m^2/ cm

    N: RPM

    T: Torque corresponding to RPM, kN.m

    t: Time duration in minutes, normally 10 min

    A: Pile cross-section area, m^2

    D: Pile penetration, cm

    2. Chiseling Energy Concept

    Use the following expression to estimate the response of founding rock strata in terms of Energy Level:

    E=(W⋅h⋅n⋅N)/(A⋅d)                         Equation 2

    Where:

    E: Chisel energy level, kN.m/m^2/cm

    W: Weight of chisel, kN

    h: Fall of the chisel in meters given in every blow (m)

    n: Reduction factor, 0.8–1.0 based on likely drag on chisel due to slurry, submerged weight of chisel in high groundwater, winch rope friction, and type of muck (clayey or sandy), based on rock type.

    N: No. of blows in the stipulated duration, usually half an hour

    A: Nominal pile cross-sectional area, m^2

    D: Penetration into the rock strata in that stipulated duration, cm

    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.