Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What is zero air void line in soil?

Home/ Questions/Q 46870
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: July 24, 20202020-07-24T19:55:48-07:00 2020-07-24T19:55:48-07:00In: Geotechnical Engineering
Vivek Patel
Vivek Patel

Vivek Patel

  • 39 Questions
  • 80 Answers
  • 1 Best Answer
  • 6 Points
View Profile
Vivek Patel User

What is zero air void line in soil?

  • 3
  • 4 4 Answers
  • 38,486 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

4 Answers

  • Voted
  • Oldest
  • Recent
  1. Abbas Khan Civil Engineer

    Abbas Khan Civil Engineer

    • 11 Questions
    • 29 Answers
    • 1 Best Answer
    • 925 Points
    View Profile
    Abbas Khan Civil Engineer Learner
    2020-07-27T15:17:24-07:00Added an answer on July 27, 2020 at 3:17 pm

    The zero Air Void line is obtained when there is no presence of the air in the pores of a soil mass and totally filled with the water and soil mass get saturated. It is determined by the compaction test of a soil. Draw the graph between Dry Density VS water content, calculate the dry density from the compaction test results, and Zero Air void line is drawn on the graph.

     

    Graph A

    • 19
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Hassan Mohsin

    Hassan Mohsin

    • 0 Questions
    • 1 Answer
    • 0 Best Answers
    • 27 Points
    View Profile
    Hassan Mohsin User
    2020-07-27T10:26:36-07:00Added an answer on July 27, 2020 at 10:26 am

    Basically a soil particle has three layers; the first layer is of air, 2nd water and 3rd is of solids.

    Now to build a structure on a soil base there must be minimum air voids(to avoid settlement). We eliminate the air voids through compaction. But no matter how hard we try we can’t eliminate all the air voids and get zero air voids. But theoretically speaking we can calculate the dry density for zero air voids.

    Thus draw a graph for dry unit weight and moisture content where the peak represents OMC(optimal moisture content) while there is also a straight line representing soil which is 100% saturated with zero air voids. This straight line is called a ZERO AIR VOID LINE.

    Note that zero air void line cant be achieved in real life.

    • 17
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. INDER KUMAR YADAV

    INDER KUMAR YADAV

    • 0 Questions
    • 14 Answers
    • 1 Best Answer
    • 562 Points
    View Profile
    INDER KUMAR YADAV Learner
    2020-07-27T14:53:13-07:00Added an answer on July 27, 2020 at 2:53 pm

    Zero air void line is the line that shows the relationship between the water content and the dry unit weight of the soil with a 100% degree of saturation or at zero void is called the zero air void line or 100% degree of saturation line.

    But this does not mean that 15% air void is equal to an 85% degree of saturation.

    • 11
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. VoiD

    VoiD

    • 1 Question
    • 6 Answers
    • 0 Best Answers
    • 159 Points
    View Profile
    VoiD Beginner
    2020-07-27T11:27:07-07:00Added an answer on July 27, 2020 at 11:27 am

    The Zero air void line is obtained on a Dry Density v/s Water Content graph. It represents the relationship between water/moisture content and dry density.

    The zero air void line doesn’t intersect the curve attained on Dry density v/s Water content graph because soil can never achieve zero void condition with any kind of compaction.

    • 4
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.