Column Slightly Inclined on 1st Floor of the building
Fasi Ur Rahman
Inclining of columns is not accepted in construction. The columns must be truly vertical. In some cases, a deviation of 10 to 15mm or 2 to 3 % is permissible. Yes, if the columns are not verticle the load transfer which happens via column is not 100%. This affects the durability and life of the builRead more
Inclining of columns is not accepted in construction. The columns must be truly vertical. In some cases, a deviation of 10 to 15mm or 2 to 3 % is permissible.
Yes, if the columns are not verticle the load transfer which happens via column is not 100%. This affects the durability and life of the building. Due to this, there might be a risk of safety during calamities.
The justification is given by the supervisor is not correct. To rectify the mistakes done during the casting of columns, the columns are plastered to make them look truly vertical.
See lessWhat are the construction activities involved in building construction?
Fasi Ur Rahman
The sequence of work to be followed in constructing a building is the most important construction procedure. The major building construction sequences are marking, excavation, concreting, brick masonry, roof laying, flooring, and finishing. Kindly check the article below for in detail building constRead more
The sequence of work to be followed in constructing a building is the most important construction procedure. The major building construction sequences are marking, excavation, concreting, brick masonry, roof laying, flooring, and finishing.
Kindly check the article below for in detail building construction sequence-
Sequence of Work in Building Construction
See lessHow to calculate the surface area of the rebar?
Fasi Ur Rahman
Calculation of the surface area of the rebar- Considering the dia of rebar as 16mm and length as 1m. Surface area= Length x Circumference of the bar (Considering bar having smooth surface) = 1 x 2 π r = 1 x (2 x 3.142 x 0.008) =0.05 Sqm
Calculation of the surface area of the rebar-
Considering the dia of rebar as 16mm and length as 1m.
Surface area= Length x Circumference of the bar (Considering bar having smooth surface)
= 1 x 2 π r
= 1 x (2 x 3.142 x 0.008)
=0.05 Sqm
See lessWhich instrument is widely used for surveying?
Komal Bhandakkar
Instrument used for survey are listed below: 1) Instruments for chaining: A)Chain: i) Metric Chain ii) Gunter's Chain iii) Engineers Chain iv) Revenue Chain V) Steel Band or Band Chain B) Tapes: I) Cloth or linen tape ii) Metallic Tape iii) Steel Tape iv) Invar Tape C)Arrows D) Pegs E)Read more
Instrument used for survey are listed below:
1) Instruments for chaining:
A)Chain:
i) Metric Chain
ii) Gunter’s Chain
iii) Engineers Chain
iv) Revenue Chain
V) Steel Band or Band Chain
B) Tapes:
I) Cloth or linen tape
ii) Metallic Tape
iii) Steel Tape
iv) Invar Tape
C)Arrows
D) Pegs
E) Ranging Rods
F) Offset Rods
G) Plumb Bobs
2) Instrument for measuring horizontal & vertical angles:
I) Theodolite:
a) Transit Theodolite
b) Non-Transit Theodolite
3) Levelling Instrument: Dumpy Level
See lessShrinkage reinforcement direction and percentage in wing walls
aviratdhodare
Make it simple. The quantity of rebar should be according to moment or min reqd. About the direction, simply find the direction of moment and give the rebars to resist them.
Make it simple. The quantity of rebar should be according to moment or min reqd. About the direction, simply find the direction of moment and give the rebars to resist them.
See lessHow to rectify the old cement pipeline leakage problem?
Komal Bhandakkar
If you have a leaking pipe below your Foundation then it is either a water or sewer line. Repairing the damage the line is not too hard and difficult task however locating and giving asses to it is matters a lot. Once you locate the general area of the leak then you will have to cut and reason yourRead more
If you have a leaking pipe below your Foundation then it is either a water or sewer line. Repairing the damage the line is not too hard and difficult task however locating and giving asses to it is matters a lot. Once you locate the general area of the leak then you will have to cut and reason your way through the concrete to repair the pipes. There are several points to a slab leak. The presence of water is one of the main symptoms of leakage. The most commonly used type of pipe for water line under a slab Foundation is copper tubing. As copper pipe age then they are prone to wearing thin and springing a leak. Fixing a leaking sewer line may require the services of a plumber because of the types of pipes used for civil line and health-related issues involving exposure to human waste. Depending on the age of the home, the pipe may be cast iron, clay, or PVC. Special rubber couplings are ideal for connecting different types of pipes they are not recommended for use below concrete slabs.
See lessHow to pour Concrete in Narrow/Sleak Columns?
nikeetasharma
Generally, pouring concrete in narrow columns needs great caution to ensure the achievement of designated strength and durability because of its narrowness. Place the concrete in layers, and compact each layer properly to obtain a consolidated concrete mass that encircles steel bars and has low permRead more
Generally, pouring concrete in narrow columns needs great caution to ensure the achievement of designated strength and durability because of its narrowness. Place the concrete in layers, and compact each layer properly to obtain a consolidated concrete mass that encircles steel bars and has low permeability. Use vibrations to consolidate fresh concrete, but avoid over-vibration as it may cause segregation.
Here are some steps or points which are helpful for pouring the concrete in narrow/sleak column :-
1. If the height of the column form is not considerably long, pour concrete from the top of the forms.
See less2. Place concrete at or close to its final position.
3. Pour concrete in layers with a thickness ranging from 30cm to 50cm if the height of the RC column is large.
4. The period between successive concrete layers should not be longer than half an hour for normal concreting conditions and 20 minutes in case of hot weather conditions.
5. Freefall of concrete from the trunk end should be done from 0.9 to 1.5m (occasionally restricted to 0.6m); otherwise, segregation would occur.
6. The concrete freefall should be continuous. Prevent separation because of free falling of concrete over reinforcement or other embedded objects.
7. Discharge concrete into the formworks directly without the use of chutes, trunks, or hoppers, if possible, to decrease segregation possibilities.
8. Vibrate each layer to compact it properly. Lift the vibrator after the complete compaction of each concrete layer. Extend vibrator into the previous layer by 10-15cm.
9. If the supply of concrete interrupts during concrete pouring, try to avoid the formation of cold joints in the column.
10. Sometimes, set retarder materials might be used to the concrete surface to delay its setting and create a good bond with the next batch of concrete. Sugar can retard the concrete setting time by up to four hours. The next layer of concrete should be thinner than previous ones, and vibration should extend into the previous layers.
11. In RC columns, start concrete pouring with 5 to 10 cm grout to avoid collection of loose stones at the bottom that lead to honeycomb formation. The grout slump is the same as the concrete slump with the same or lower w/c ratio.
12. Alternatively, place the same concrete mix with half coarse aggregate at the bottom with a thickness range from 15-30cm.
13. Roughen concrete surfaces after initial set with brush, if, for any reason concreting stops for a day to create good bonding with the next concrete layer.
14. In summary, avoid problems arising from improper concreting practices by preventing full depth placement of concrete at one point, a lower slump for upper layers, preventing lateral movement of vibrators in concrete, and thoroughly vibrating concrete.
What shall be the spacing for core cutter sample for dry density determination for each layer while constructing long embankment?
Komal Bhandakkar
Dry density by using a core cutter method: The dry density of soil can be determined with the help of the core cutter method. Because of change in the moisture content from time to time that's why there is a change in the field density as well Hence it is essential to record the test results in termRead more
Dry density by using a core cutter method:
The dry density of soil can be determined with the help of the core cutter method.
Because of change in the moisture content from time to time that’s why there is a change in the field density as well Hence it is essential to record the test results in terms of dry density.
Bulk density and water content required for calculating the dry density of soil using the core cutter method.
There is no specification given in the IS Code regarding the spacing of the core cutter apparatus for finding out the dry density value accurately.
Thank you.
See less