Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Interview Questions

Home/Interview Questions/Page 2

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: September 23, 2020In: Interview Questions

Why only cylinders shape were used to test Split Tensile Strength of Concrete?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

Why only cylinders shape were used to test Split Tensile Strength of Concrete?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 18, 2020 at 7:41 pm

    Tensile test is done on cylinder because only cylinders can be held under pure tension by applying a compressive load. That will only happen if it was under pure tension. If we take any other prismatic shape such as square cross section cylinder, the failure will be via compression but not tension.

    Tensile test is done on cylinder because only cylinders can be held under pure tension by applying a compressive load. That will only happen if it was under pure tension. If we take any other prismatic shape such as square cross section cylinder, the failure will be via compression but not tension.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 29
  • 2 2 Answers
  • 3,064 Views
  • 0 Followers
Asked: September 23, 2020In: Interview Questions

Why cubes are tested at 3, 7 and 28 days for the Compressive Test?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

Why cubes are tested at 3, 7 and 28 days for the Compressive Test?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 18, 2020 at 8:07 pm

    Cubes are tested at 3 , 7 and 28 days for the compressive test to gain more strength.

    Cubes are tested at 3 , 7 and 28 days for the compressive test to gain more strength.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 32
  • 3 3 Answers
  • 16,065 Views
  • 0 Followers
Asked: October 20, 2017In: Interview Questions

What are Technical Interview Questions of Highway Company?

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 75 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

What are the technical question generally asked in interview of highway company?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 26, 2020 at 12:37 pm

    Hello Sir ! Recently I'm in my bachelor's but once I visited my uncle's highway company. So, there I was asked some interview questions related to highway. I want to share some of it here; - What is highway engineering and it's importance? - Describe super elevation and set-back distance. - Why tranRead more

    Hello Sir ! Recently I’m in my bachelor’s but once I visited my uncle’s highway company. So, there I was asked some interview questions related to highway. I want to share some of it here;

    – What is highway engineering and it’s importance?
    – Describe super elevation and set-back distance.
    – Why transition curve is provided?
    – Describe history of highway engineering.
    – What is carriageway?

    Thank you!

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 1,633 Views
  • 0 Followers
Asked: July 19, 2020In: Interview Questions

What is the meaning of kick-off meeting?

fathima
fathima

fathima

  • 26 Questions
  • 10 Answers
  • 0 Best Answers
  • 377 Points
View Profile
fathima Beginner

What is the meaning of kick-off meeting?

  1. DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 19, 2020 at 9:30 pm

    The reason for the kickoff meeting is to officially notify all partners that the project has started and ensured everybody has a typical comprehension of the undertaking and his job. The kickoff meeting is a chance to get all the colleagues, clients, and stakeholders together and officially set up fRead more

    The reason for the kickoff meeting is to officially notify all partners that the project has started and ensured everybody has a typical comprehension of the undertaking and his job. The kickoff meeting is a chance to get all the colleagues, clients, and stakeholders together and officially set up for the beginning of the project. Like every official meeting, there ought to be a plan. There are various explicit things you need to cover at this meeting:

    • Introduce the people at the meeting.
    • Recap the information in the Project Charter, including:
      • The purpose of the project
      • Scope
      • Major deliverables
      • Risks
      • Assumptions
      • Estimated effort and budget
      • Deadline

    Examine the significant jobs and duties of the undertaking group, clients, and stakeholders. Many, if not the entirety of the individuals that will take a shot at the undertaking, ought to be in attendance.

    Go over the general methodology and course of events of the venture. This gives individuals a sense of how the undertaking will unfold. Specifically, you will need to guarantee that individuals comprehend what they should do in the present moment to help the undertaking.

    Talk about and answer any exceptional inquiries. The reason for the conversation isn’t to reiterate the motivation behind the venture, however, to permit individuals to voice specific queries or concerns they have as the task starts.

    Affirm that the task is currently in progress. On the off chance that the undertaking has not begun at this point, it should now be prepared to start right away.

    Different things to consider in the kickoff meeting include:

    Participants. By and large, the undertaking group, clients, and stakeholders ought to be in participation. If these outcomes in such a large number of individuals for comfort, you can consider having just the significant players join in. You would then be able to meet with others in resulting smaller than usual kickoff meetings, or you can send the meaningful meeting data to the individuals who couldn’t join in.

    Length. Although most kickoff meetings can be directed in an hour or two, others may require a day or two. The longer kickoff meetings are particularly significant if the undertaking is extremely perplexing or dubious. Now and again, a long kickoff meeting might be valuable as an approach to assemble starting prerequisites, although that would not be the primary role.

    Preparation. It is said you never have another opportunity to establish a decent first connection. This is valid with the kickoff meeting. You are utilizing the meeting to help set desires for the undertaking. If the meeting is unorganized, chaotic, or a waste of time, the members will likely convey those discernments into the task also. The task director needs to ensure that he has arranged well for this meeting and that it goes easily. The undertaking administrator ought to likewise converse with the support early and settle on sure that they are in concurrence with how the meeting will advance.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 1,647 Views
  • 0 Followers
Asked: July 27, 2020In: Interview Questions

What is Nappe Phenomena on Causeway?

civl engineer
civl engineer

civl engineer

  • 6 Questions
  • 0 Answers
  • 0 Best Answers
  • 30 Points
View Profile
civl engineer User

What is Nappe Phenomena on Causeway?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 17, 2020 at 3:38 pm

    Causeway is a type of bridge which flows east to west.

    Causeway is a type of bridge which flows east to west.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 777 Views
  • 0 Followers
Asked: July 3, 2020In: Interview Questions

Why gravity dam is called gravity dam ?

Jigar Chaudhari
Jigar Chaudhari

Jigar Chaudhari

  • 2 Questions
  • 1 Answer
  • 0 Best Answers
  • 17 Points
View Profile
Jigar Chaudhari User

Why gravity dam is called a gravity dam? Is there any reason behind the name?  

  1. Kuldeep Singh

    Kuldeep Singh

    • 1 Question
    • 110 Answers
    • 10 Best Answers
    • 652 Points
    View Profile
    Kuldeep Singh Learner
    Added an answer on July 4, 2020 at 5:06 pm

    Gravity dam, as the name suggests, is a dam that resists the water upstream by the use of its weight itself, unlike earthen dams and embankment dams that employ the shear strength of the soil. The dam is designed so that the resultant of the water pressure, earth pressure, and all other forces are aRead more

    Gravity dam, as the name suggests, is a dam that resists the water upstream by the use of its weight itself, unlike earthen dams and embankment dams that employ the shear strength of the soil.

    The dam is designed so that the resultant of the water pressure, earth pressure, and all other forces are aligned and balanced by the weight of the dam itself.

    They are generally made of Roller compacted concrete.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 3 3 Answers
  • 2,154 Views
  • 0 Followers
Asked: September 22, 2020In: Interview Questions

What is mean by sheroid triangle in the survey?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

What is mean by sheroid triangle in the survey?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 23, 2020 at 12:15 pm

    The triangle which is formed on the earth by three geodesic lines joining three points on a spheroid while performing geodetic survey is known as spheroid triangle. Thank you.

    The triangle which is formed on the earth by three geodesic lines joining three points on a spheroid while performing geodetic survey is known as spheroid triangle.

    Thank you.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 32
  • 3 3 Answers
  • 749 Views
  • 0 Followers
Asked: February 2, 2021In: Interview Questions

How can we use magnetic levitation method in civil engineering?

Bhavani Pesaru
Bhavani Pesaru

Bhavani Pesaru

  • 3 Questions
  • 0 Answers
  • 0 Best Answers
  • 20 Points
View Profile
Bhavani Pesaru User

How can we use magnetic levitation method in civil engineering?

  • 1
  • 0 0 Answers
  • 1,108 Views
  • 1 Follower
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.