Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What are rental charges and prices for the various conventional construction equipment used for construction in India and around the world?

Home/ Questions/Q 44829
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: June 18, 20202020-06-18T22:28:56-07:00 2020-06-18T22:28:56-07:00In: Construction
Rohan Chaugule
Rohan Chaugule

Rohan Chaugule

  • 12 Questions
  • 11 Answers
  • 1 Best Answer
  • 1,045 Points
View Profile
Rohan Chaugule Expert

What are rental charges and prices for the various conventional construction equipment used for construction in India and around the world?

  • 0
  • 2 2 Answers
  • 1,869 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

2 Answers

  • Voted
  • Oldest
  • Recent
  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-09-07T17:52:54-07:00Added an answer on September 7, 2020 at 5:52 pm
    What are rental charges and prices for the various conventional construction equipment used for construction in India and around the world?

    Rental charges for various conventional construction equipment in India:

    1) Crane:

    • Escort f15 ton: 110000 rupees per unit
    • ACE Hydra 14 ton 85000 per month
    • Tower cranes ACE 5040: 20 lakh per unit
    • Mobile tower crane Alpha SP 453 : 90000 per month
    • Mobile tower crane ACE 2418 :72000 per month
    • Gantry crane:75000 per month

    2) Road machinery:

    • Soil compactor Escort S 250: 90000 per month

    3) Earth moving machinery:

    • Excavator Hyundai 220: 1.5 Lakh per month
    • Excavator L8T Komatsu PC 200: 200000 per unit

    4) Concrete machinery:

    • Transit mixture 120000 per unit for a minimum of 3 days

    5) Construction plants:

    • Batching plant: 225000 per month
    • 41
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. poojan

    poojan

    • 5 Questions
    • 14 Answers
    • 1 Best Answer
    • 604 Points
    View Profile
    poojan Learner
    2020-07-02T18:36:42-07:00Added an answer on July 2, 2020 at 6:36 pm

    Rental charges are not fixed; there are many factors which affect the rental cost:

    1. Location of work, and availability of supplier in that location: Location of site, the terrain of the site, If there are no local suppliers than the cost may be higher.
    2. Type of terms and condition for the rental agreement: Fixed hours Vs. Flex. hours, Fuel will be provided by which stakeholder, Inspection will be done by which stakeholder, the Machine operator will be by which stakeholder, Insurance will be by which stakeholder, Equipment maintenance will be under whose scope, etc..
    3. Duration of renting: If the machine is rented for longer time period there are chances that the rent may be less as compared to less duration.
    4. Type of machinery and model of machinery: If it is a crawler-mounted, or wheel mounted, fixed or mobile equipment (In crane). The capacity of required machinery, etc…

    There may be many other reasons, which can affect the rental cost of the machine, but an estimate can be done by working out its owning and operating cost.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.