Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What is the meaning of the work breakdown structure in the construction program?

Home/ Questions/Q 46340
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: July 19, 20202020-07-19T12:59:17-07:00 2020-07-19T12:59:17-07:00In: Miscellaneous
fathima
fathima

fathima

  • 26 Questions
  • 10 Answers
  • 0 Best Answers
  • 377 Points
View Profile
fathima Beginner

What is the meaning of the work breakdown structure in the construction program?

  • 2
  • 2 2 Answers
  • 1,474 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

2 Answers

  • Voted
  • Oldest
  • Recent
  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    2020-09-02T21:10:45-07:00Added an answer on September 2, 2020 at 9:10 pm

    In simple words, work breakdown structure (WBS) is a breakdown of the project to smaller parts or components for deliverable oriented. It is a term related to project management and systems engineering.

    It is a simplifying tool for a particular task of the project.

    Following are the purpose of the work  breakdown structure:

    1. To recognise the distinct nature of large activity or project
    2. Used for estimating the cost and time required for a project
    3. Control and monitor the tasks
    4. Used for controlling and give unique Identity to each task.

    Following are types of WBS:

    1. Phase Oriented WBS
    2. Deliverable oriented WBS

    Following are some effective guidelines for WBS

    1. The internal in trim and external work of the project should be identified and must all the deliverables that have to be completed.
    2. Using a top-down approach in the project is divided into sub-projects and this continues until the task can be estimated. This approach is popular because of great accuracy.
    3. Level of details
    4. Symmetry absence.
    5. Details of level
    • 44
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Preet Chovatiya

    Preet Chovatiya

    • 11 Questions
    • 81 Answers
    • 5 Best Answers
    • 858 Points
    View Profile
    Preet Chovatiya Learner
    2020-07-20T10:45:31-07:00Added an answer on July 20, 2020 at 10:45 am

    Work Breakdown structure is one task in which the whole work is a breakdown into smaller tasks for ease of utilization and efficient work. It is an important tool in project management work.

    Generally, there are two types of WBS:-

    1. Delivery based WBS

    2. Phase based WBS

     

    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.