Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must log in to ask a question. Join now!

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Join now!
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Which are the methods for the demolition of any structure?

Home/ Questions/Q 44856
Next
In Process

Do you need to remove the ads? Join now!

Asked: June 20, 20202020-06-20T21:15:39-07:00 2020-06-20T21:15:39-07:00In: Interview Questions
Preet Chovatiya
Preet Chovatiya

Preet Chovatiya

  • 11 Questions
  • 81 Answers
  • 5 Best Answers
  • 858 Points
View Profile
Preet Chovatiya Learner

Which are the methods for the demolition of any structure?

  • 1
  • 2 2 Answers
  • 403 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

2 Answers

  • Voted
  • Oldest
  • Recent
  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-09-12T18:52:04-07:00Added an answer on September 12, 2020 at 6:52 pm

    Demolition is defined as simply the safe and careful removal of existing buildings & structures in order to utilise the land for another use.

    The several methods for the demolition of any structure are as follows ;

    • Total Demolition : It refers to the demolition of an entire building or structure. In case of community re-structure, this is the most common method.
    • Interior Demolition : This method refers to the demolition of interior part of the building, while protecting and maintaining the exterior structure. For example; partition walls, ceilings, etc. This method is one of the great option for creating more space inside the building by removing the troubling areas.
    • Selective Demolition : This method refers to the removing of specific parts of the building. In case if there is a old building which is not performing as it should & the entire building is not a state of concern. Or perhaps it is a listed building, therefore it may be restricted as to what and how much you can demolish. So you could select a particular section of a building to demolish and build up from scratch.
    • 34
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Ancy Joby

    Ancy Joby

    • 20 Questions
    • 11 Answers
    • 1 Best Answer
    • 580 Points
    View Profile
    Ancy Joby Learner
    2020-07-05T17:25:53-07:00Added an answer on July 5, 2020 at 5:25 pm

    Demolition methods are chosen based on several factors.It depends on type of material used in building, based on location of building, waste disposal etc…
    Widely used demolition across the world are as follows

    1. Implosion
    2. Selective Demolition
    3. Wrecking ball demolition
    4. Mechanical demolition
    5. High Reach Arm Demolition

    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must log in to add an answer.

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Join Here

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Gopal Mishra

    Calculate Quantities of Materials for Concrete -Cement, Sand, Aggregates

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transportation, and Storage

Recent Articles

  • constructororghq

    Effective Ways to Combat Construction Site Theft

  • constructororghq

    The Top Flat Roof Solutions to Keep Your Home Protected

  • constructororghq

    Avoiding Costly Flood Damage in Your New Construction Project

  • constructororghq

    The ABCs of Pipeline Pigging: Everything You Need to Know

  • constructororghq

    The Yellow Standard: Why Construction Equipment is Always Yellow

Recent Questions

  • jkshah

    Which is the code used for the design of the RCC Bridge?

    • 1 Answer
  • AKM59

    What is the tolerance for compression test results of concrete, according to the standards?

    • 1 Answer
  • Gopal Mishra

    What must be the maximum dry density of Granular Sub Base & Wet Mix Macadam used ...

    • 1 Answer
  • Gopal Mishra

    What is the Safe Bearing Capacity values for Different Soils?

    • 1 Answer
  • Gopal Mishra

    What are the different types of handrails used in bridges?

    • 1 Answer

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.