Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must log in to ask a question. Join now!

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Join now!
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Why construction joints are not provided in residential buildings?

Home/ Questions/Q 46885
Next
In Process

Do you need to remove the ads? Join now!

Asked: July 24, 20202020-07-24T19:52:47-07:00 2020-07-24T19:52:47-07:00In: Construction
Tips_and_tricks
Tips_and_tricks

Tips_and_tricks

  • 13 Questions
  • 15 Answers
  • 1 Best Answer
  • 685 Points
View Profile
Tips_and_tricks Learner

Why construction joints are not provided in residential buildings?

  • 1
  • 4 4 Answers
  • 1,168 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

4 Answers

  • Voted
  • Oldest
  • Recent
  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-09-11T00:00:42-07:00Added an answer on September 11, 2020 at 12:00 am
    Why construction joints are not provided in residential buildings?

    Construction joint 


    various types of joints in construction are listed below;

    • Construction joint
    • Expansion joint
    • Contraction joint
    • Isolation joint

    Joints are used at:

    • Concrete slab
    •  Pavements

    The purpose behind the use of joint :

    • To prevent the development of cracks in concrete

    The reason behind not usage of construction joint in the residential building :

    • Especially construction joint is used in the concrete slab
    • Construction joints should be designed in order to allow of displacement between both sides of the slab.
    • Simultaneously construction joint has to transfer flexible stresses produced in the slab by external loads.

     

    • 45
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Vivek Patel

    Vivek Patel

    • 39 Questions
    • 80 Answers
    • 1 Best Answer
    • 6 Points
    View Profile
    Vivek Patel User
    2020-07-27T15:00:37-07:00Added an answer on July 27, 2020 at 3:00 pm

    Construction joint is provided at where construction could not be done within a day like we have a long span of the slab and we have simple concrete mixture at that time we cannot construct the whole slab within one day, so we provide construction joint at the end of the day, next day we start work from that construction joint.

    Basically in the residential building we have 1200 square feet slab area per one unit, that means we can easily do a slab work within a one day, so we do not need construction joint

     

    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    CB Sowmya User
    2020-07-27T15:02:11-07:00Added an answer on July 27, 2020 at 3:02 pm

    Construction joints are provided

    1. When the day’s work comes to an end
    2. When there hasn’t been enough fresh concrete
    3. When the concrete member is tall, i.e, IS 456 restricts the free fall of concrete to 1.2 m. This means that if a column is concreted, the form works are placed only to a height of 1.2m so that the free fall of concrete does not increase 1.2 m. Further extending of the form works after the concrete has been poured is a tedious process.

    Construction joints should be avoided whenever possible. Monolithically cast sections perform better than sections with joints.

    The reason why we don’t see construction joints in typical residential buildings is because

    1. The slab is mostly cast in a single day
    2. The lintel beams, beams are also mostly cast in a single day

    Construction joints are found in columns, but they may not be prominent because of the workmanship. Columns are generally cast in stages to a height of 1.2 m each time. Between each session, bond is ensured by providing a rough surface on the older section. This ensures the bond between the new layer and the old layer.

    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-12-21T17:40:54-08:00Added an answer on December 21, 2020 at 5:40 pm

    A construction joint is provided when concrete pouring needs to be stopped due to some reasons and then is continued again later but in residential buildings, it is not required. Construction joints are often at the ends of the beams, slabs, tie beams,etc. in such cases, for the purpose of future extension. So, it is not provided in residential buildings.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must log in to add an answer.

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Join Here

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Gopal Mishra

    Calculate Quantities of Materials for Concrete -Cement, Sand, Aggregates

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transportation, and Storage

Recent Articles

  • constructororghq

    The ABCs of Pipeline Pigging: Everything You Need to Know

  • constructororghq

    The Yellow Standard: Why Construction Equipment is Always Yellow

  • constructororghq

    Why Insuring Your Construction Projects Is A Must

  • constructororghq

    How Green Building Practices Lead to Lower Carbon Dioxide Levels

  • constructororghq

    How to plan your budget for home renovation

Recent Questions

  • jkshah

    Which is the code used for the design of the RCC Bridge?

    • 1 Answer
  • AKM59

    What is the tolerance for compression test results of concrete, according to the standards?

    • 1 Answer
  • Gopal Mishra

    What must be the maximum dry density of Granular Sub Base & Wet Mix Macadam used ...

    • 1 Answer
  • Gopal Mishra

    What is the Safe Bearing Capacity values for Different Soils?

    • 1 Answer
  • Gopal Mishra

    What are the different types of handrails used in bridges?

    • 1 Answer

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.