Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Concrete

Home/Concrete/Page 3

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: May 22, 2020In: Concrete

Why shrinkage is more in Singly Reinforced section as compare to doubly Reinforced Section in RCC ?

Raghvendra_Rai
Raghvendra_Rai

Raghvendra_Rai

  • 2 Questions
  • 2 Answers
  • 0 Best Answers
  • 1,041 Points
View Profile
Raghvendra_Rai Expert

Why shrinkage is more in the Singly Reinforced section as compare to doubly Reinforced Section in RCC? Please give a detailed reason for what happens due to the uneven Distribution of Steel bars in the RCC section.

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on October 14, 2020 at 11:26 am

    Analyzing the problem from a theoretical point of view, “Shrinkage” essentially means that the concrete is trying to shrink which is on account of the chemical interaction between various constituents of concrete like cement, water and aggregates. Now providing reinforcement steel in a way holds theRead more

    Analyzing the problem from a theoretical point of view, “Shrinkage” essentially means that the concrete is trying to shrink which is on account of the chemical interaction between various constituents of concrete like cement, water and aggregates. Now providing reinforcement steel in a way holds the concrete together by way of restraining it and hence reduces the shrinkage.

    Also, Shrinkage and temperature cracks have reasonably comparable behaviour.

    Let us take a formula based approach to understand the relationship between shrinkage or temperature or shrinkage cracks and the reinforcement provided.

    As per Cl. A-1.4, IS 3370 Part-II,

    Smax = (Fct/Fb) x D / (2 x SR)

    And

    Wmax = Smax x Alpha x (T1+T2) x 0.5

    Wmax is the crack width, which is quantity of interest here

    From the above, we can deduce that all other variables being made constant valued,

    Wmax is directly proportional to Smax.

    Smax is inversely proportional to SR

    It implies Wmax is inversely proportional to SR

    So, if we want lesser shrinkage/temperature cracks, we have to increase this variable SR.

    Now, this SR = Steel ratio = Percentage of steel provided / 100

    Therefore, it is clear that, if we provide greater reinforcement, SR increases, Smax increases and Wmax decreases.

    Since singly reinforced section has less reinforcement steel than a doubly reinforced section, shrinkage/temperature cracking is more in a singly reinforced section.

    See less
    • 14
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 1,462 Views
  • 0 Followers
Asked: July 31, 2020In: Concrete

How many cement bags and sand is required for M20 grade of concrete?

Himanshu joshi
Himanshu joshi

Himanshu joshi

  • 11 Questions
  • 27 Answers
  • 0 Best Answers
  • 767 Points
View Profile
Himanshu joshi Learner

How many cement bags and sand is required for M20 grade of concrete?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 3:52 pm

    Mostly the ratio of 1:1.5:3 is used for M20 grade of concrete So, Volume of dry concrete = 1.54 to 1.57 times volume of wet concrete Assume, 1cum of concrete work ratio sum = 1+1.5+3 = 5.5 shrinkage or safety factor = 1.57 Total volume of wet concrete required is = 1.57cum Volume of broken stone reqRead more

    Mostly the ratio of 1:1.5:3 is used for M20 grade of concrete

    So, Volume of dry concrete = 1.54 to 1.57 times volume of wet concrete

    Assume, 1cum of concrete work ratio sum = 1+1.5+3 = 5.5

    shrinkage or safety factor = 1.57

    Total volume of wet concrete required is = 1.57cum

    Volume of broken stone require = (3/5.5) * 1.57 = 0.856 m3

    Volume of sand require = (1.5/5.5) * 1.57 = 0.471 m3

    Volume of cement = (1/5.5) * 1.57 = 0.285 m3
    =0.285*1440 =411 kg

    For 1 m3 of M20 (1:1.5:3)

    Broken stone = 0.856 m3

    Sand = 0.472 m3

    Cement = 8.22 bag

    Therefore,
    8 bag of cement is required for 1cum of concrete work in M20

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 5
  • 5 5 Answers
  • 83,805 Views
  • 0 Followers
Asked: July 22, 2020In: Concrete

What is meant by Dry Shrinkage?

Tips_and_tricks
Tips_and_tricks

Tips_and_tricks

  • 13 Questions
  • 15 Answers
  • 1 Best Answer
  • 685 Points
View Profile
Tips_and_tricks Learner

What is meant by Dry Shrinkage? How to prevent it? How is it different from creep?

  1. CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    Best Answer
    CB Sowmya User
    Added an answer on July 22, 2020 at 6:19 pm

    Dry shrinkage or drying shrinkage occurs due to loss of moisture in the concrete. There are different types of water in a hydrated cement paste. Dry shrinkage occurs due to the loss of capillary water. This water can be found in voids of sizes ranging from 5 nm to 50 nm in the hydrated cement paste.Read more

    Dry shrinkage or drying shrinkage occurs due to loss of moisture in the concrete. There are different types of water in a hydrated cement paste. Dry shrinkage occurs due to the loss of capillary water.

    This water can be found in voids of sizes ranging from 5 nm to 50 nm in the hydrated cement paste. Due to the small size of the voids, the water is held inside by surface tension or capillary tension. Due to the bond created by the surface tension, evaporation, or any other form of removal of this water causes significant volume changes to the structure. This volume changes causes dry shrinkage to the structure.

     

    Thanks!

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 1,743 Views
  • 0 Followers
Asked: July 22, 2020In: Concrete

Why does modulus of elasticity of concrete reduce with time?

Tips_and_tricks
Tips_and_tricks

Tips_and_tricks

  • 13 Questions
  • 15 Answers
  • 1 Best Answer
  • 685 Points
View Profile
Tips_and_tricks Learner

Why does the modulus of elasticity of concrete reduce with time?

  1. CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    Best Answer
    CB Sowmya User
    Added an answer on July 22, 2020 at 11:27 am

    The Modulus of Elasticity reduces with time because of the effect of creep. Creep is the phenomenon that occurs in hardened concrete over time, where for constant load or stress, deformation increases. Keeping that in mind, let us look at the definition of modulus of elasticity of concrete. It is thRead more

    The Modulus of Elasticity reduces with time because of the effect of creep. Creep is the phenomenon that occurs in hardened concrete over time, where for constant load or stress, deformation increases.

    Keeping that in mind, let us look at the definition of modulus of elasticity of concrete. It is the slope of the initial tangent modulus of the stress-strain curve of concrete.

    The above graph shows the stress-strain curve of the concrete at an early stage.

     

    Due to creep, for a given load/stress, deformation increases, thereby strain increases. This has been explained in the following graph.

    As a result, the slope of the curve reduces and becomes like this.

     

    As the curve descends, the slope of the initial tangent modulus of the stress-strain curve of concrete reduces.

    As a result, the modulus of elasticity also reduces.

     

    Thank you!

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 4,740 Views
  • 0 Followers
Asked: September 29, 2020In: Concrete

How to adjust mix proportions if we have to work with wet sand?

Kuldeep Singh
Kuldeep Singh

Kuldeep Singh

  • 1 Question
  • 110 Answers
  • 10 Best Answers
  • 652 Points
View Profile
Kuldeep Singh Learner

If we have wet sand and we don’t know the exact weight of dry sand, How do we adjust the w/c ratio and mix proportions?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 25, 2020 at 11:37 am

    If you are working with wet or moisture sand and without any tech then ; 1. Just weigh a sample of aggregate from inside your stockpile in a metal or other heat resistance receptacle.This must be a tare weight. 2. Place this sample in an oven or any heating material to remove moisture. 3. Again weigRead more

    If you are working with wet or moisture sand and without any tech then ;
    1. Just weigh a sample of aggregate from inside your stockpile in a metal or other heat resistance receptacle.This must be a tare weight.

    2. Place this sample in an oven or any heating material to remove moisture.

    3. Again weight the sample of aggregate.

    4. Subtract weight of 3 from 1 .

    5. When using aggregate from this stockpile for your concrete mix reduce water addition by weight determined in point 4 for each unit weight determined at 1 that you add.

    After this you will get to see water releasing from your aggregate. Also understand that the moisture content is most important on your sand less so in your course aggregate.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 3,804 Views
  • 0 Followers
Asked: May 14, 2020In: Concrete

What is Short Bracket Structural System?

amr soliman
amr soliman

amr soliman

  • 9 Questions
  • 4 Answers
  • 0 Best Answers
  • 146 Points
View Profile
amr soliman Beginner

What is a short bracket structural system and why we use it?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 11, 2020 at 2:13 pm
    This answer was edited.

    Hi, In technical terms, the bracket is one of the overhanging members that enable projects from structures i.e walls, and are usually designed to support a vertical type of load or to any angle of strengthening. Application brackets can structural atoms like walls balconies parapets,  eaves arches, Read more

    Hi, In technical terms, the bracket is one of the overhanging members that enable projects from structures i.e walls, and are usually designed to support a vertical type of load or to any angle of strengthening.

    • Application

    brackets can structural atoms like walls balconies parapets,  eaves arches,  pergola, etc. In ancient days brackets are being developed a structural manner to give it a decorative purpose and in parallel used for support. In many ancient temples, sculptures of gods are decorated on bracket frames which are located on the exterior of walls. I mentioned this in a previous comment. The brackets are may be made up of stone, wood, steel I, cement, etc.  

    See less
    • 39
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 4 4 Answers
  • 1,027 Views
  • 0 Followers
Asked: May 21, 2020In: Concrete

How to Calculate the Specific Gravity of Cement with respect to IS code?

deepana
deepana

deepana

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 10 Points
View Profile
deepana User

How to Calculate the Specific Gravity of Cement with respect to IS code?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 13, 2020 at 9:19 pm
    How to Calculate the Specific Gravity of Cement with respect to IS code?

     The specific gravity of cement: Definition : The ratio of the weight of a given volume of cement to the weight of an equal volume of water is called specific gravity of cement. IS Code of specific gravity test is IS 2720 part 3 Apparatus required : Le-Chatelier flask Weighing balance of 0.1 Gram acRead more

     The specific gravity of cement:

    Definition :

    The ratio of the weight of a given volume of cement to the weight of an equal volume of water is called specific gravity of cement.

    IS Code of specific gravity test is IS 2720 part 3


    Apparatus required :

    • Le-Chatelier flask
    • Weighing balance of 0.1 Gram accuracy

    Sample materials required :

    • Cement
    • Kerosene

    Important key points :

    1. The specific gravity of kerosene is 0.79 gram per centimetre cube
    2. The specific gravity of water is 1 gram per centimetre cube

    Interesting point :

    The reason behind kerosene is used to find out the specific gravity of cement and not the water is given below;

    • In general, to calculate the specific gravity of the material, we use water.
    • In the case of cement, we use kerosene for finding specific gravity of it.
    • Cement hydrates and forms calcium oxide when it reacts with water
    • Cement won’t show any type of reaction when it mixed with kerosene. Hence kerosene is used to find the specific gravity of cement instead of water.

    I hope you learn some new concepts from my answer. Thank you.

    See less
    • 47
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 4 4 Answers
  • 3,682 Views
  • 0 Followers
Asked: February 12, 2020In: Concrete

How to Calculate Rate Analysis For Concrete 1:2:4?

c
c

c

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 0 Points
View Profile
c User

Do we calculate wastage for Cement, 20mm and coarse aggregate in rate analysis for concrete?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 7:59 am
    This answer was edited.

    Hi, Please specify the type of wastage you would like to reduce. Because cement sand and aggregate are measured at the initial stage and then for the mix for making a concrete paste. So if mix ratio is correct then there is no probability of wastage of these materials. In some cases, if the mix ratiRead more

    Hi,

    Please specify the type of wastage you would like to reduce. Because cement sand and aggregate are measured at the initial stage and then for the mix for making a concrete paste. So if mix ratio is correct then there is no probability of wastage of these materials. In some cases, if the mix ratio is not proper then more amount of concrete test it is made by the labour which is considered as the waste. But it depends upon is site engineer and mix ratio. Steel reinforcement is also used in construction, which manufactured in proper length. Thus, some small parts remain in used and considered as waste.

    Hope you get the answer.

    See less
    • 34
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 5
  • 4 4 Answers
  • 45,838 Views
  • 0 Followers
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.