I want to know minimum time required for finishing activities because I want to schedule a residential project in msproject
When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should nRead more
When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should not be allowed to stand too long because creep loads may overstress them.
See less
Komal Bhandakkar
The most average time to build a multi family house which varies the number of units in a building. In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9Read more
The most average time to build a multi family house which varies the number of units in a building.
In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9 unit building came in at 11.5 months.
The average time from permits to start does not follow the same pattern with respect to property size. Properties with 10 to 19 units had the longest average waiting period.
See less