Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Why is propping required for long structures once the formwork is removed?

Home/ Questions/Q 46972
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: July 27, 20202020-07-27T19:50:07-07:00 2020-07-27T19:50:07-07:00In: Construction Site Related
DevilAVRT
DevilAVRT

DevilAVRT

  • 27 Questions
  • 49 Answers
  • 3 Best Answers
  • 207 Points
View Profile
DevilAVRT Beginner

Why is propping required for long structures once the formwork is removed?

  • 1
  • 5 5 Answers
  • 2,240 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

5 Answers

  • Voted
  • Oldest
  • Recent
  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-19T23:27:27-07:00Added an answer on October 19, 2020 at 11:27 pm
    This answer was edited.
    Why is propping required for long structures once the formwork is removed?

    After concreting work, the time at which striking of formworks should not be too long, otherwise it would affect the colour of structures.


    For long-span concrete structures when they have attained a sufficient amount of strength to support their self-weight as well as creep and deflection maker in these structures and cropping is not provided after the removal of formwork.


    Hence, re-propping is carried out after removing formwork and these props should not be allowed to stand too long because creep loads may overstress them.


    Propping for to provision of false for support slabs and pains during their game in cotton strength after concreting.


    Thanks You.  

    • 23
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    CB Sowmya User
    2020-07-28T22:13:04-07:00Added an answer on July 28, 2020 at 10:13 pm

    The formworks are removed after the concrete has reached a strength at least twice its removal stress. But the members should be supported with the help of props. The reason is because of creep due to the Interfacial transition zone (ITZ).

    The interfacial transition zone is formed in the concrete between the aggregates and the mortar. This zone comprises of high Water cement ratio and hence is the weakest part of the concrete. Due to the high WC ratio, the hydration reaction in the ITZ produces a porous framework in the early stages. This porous network will be filled in subsequently by stronger gels such as CSH gel as the hydration reaction proceeds. But for this to take place, sufficient time is needed. As time increases, the ITZ becomes stronger.

    This is why the creep coefficient reduces as we delay the age of loading. When the props are moved, the self-weight of the structure acts on it, which is equivalent to loading the structure.

    We know that the creep coefficient when loaded at

    Seven days – 2.2

    28 days – 1.6

    One year – 1.1

    Due to the high creep coefficient, the structure may become susceptible to sagging when the props are removed soon.

    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. VaishnaveeRakhunde

    VaishnaveeRakhunde

    • 0 Questions
    • 3 Answers
    • 0 Best Answers
    • 92 Points
    View Profile
    VaishnaveeRakhunde User
    2020-10-30T22:47:22-07:00Added an answer on October 30, 2020 at 10:47 pm
    This answer was edited.

    Its very important to use props after removing the formwork for supporiting the concrete stucture for some time.

    Specially the in concrete bridges, the props are used after removing the formwork.

    Props provide false support to the structure.  

    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    2020-10-28T23:13:06-07:00Added an answer on October 28, 2020 at 11:13 pm

    Cast concrete does not reach full strength after approximately 28 days. After 4 to 5 days of concrete curing time, a contractor can then continue their work, say the next floor above, after propping up the structure. Propping is done to prevent damage to the concrete integrity during curing.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-11-12T20:09:40-08:00Added an answer on November 12, 2020 at 8:09 pm

    When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should not be allowed to stand too long because creep loads may overstress them.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.