Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction Site Related

Home/Construction Site Related/Page 4

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random
  1. Asked: August 2, 2020In: Construction Site Related

    How to perform estimation for a steel gate?

    AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 230 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on August 10, 2020 at 8:53 pm

    Estimation of gates or steel for doors or Window grills depends upon the length and width of the structure. It also depends upon the design that we adopted for construction and types of joints example welding etc. So the estimation of steel gates is different for different sizes. For small-sized winRead more

    Estimation of gates or steel for doors or Window grills depends upon the length and width of the structure.

    It also depends upon the design that we adopted for construction and types of joints example welding etc. So the estimation of steel gates is different for different sizes.

    For small-sized windows, less quantity of steel is required thus cost decreases. and for big windows, a large amount of steel is required which increases cost.

    In market door grills are of following types:

    1. SS laser cutting grills – 850/ sq feet
    2. Safety door grill- 950/sq. Feet
    3. Stainless steel door grills- 600/sq. Feet
    4. Matt, mirror stainless steel gates- 1,200/sq. Feet
    5. Cross pattern door grills- 30/sq. Feet
    6. Laminated door grills- 250/sq. Feet

    So the estimation cost of door grills is depended upon square feet area,  design and types of materials used.

    See less
    • 40
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: August 2, 2020In: Construction Site Related

    What is chases, rebates and throating in stone masonry work?

    AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 230 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on August 10, 2020 at 8:51 pm

    Rebate is a top edge cut on the stone so that it does not allow the rainwater to penetrate inside the stone mortar or joint and flows quickly from the horizontal surface of stone masonry. Throating is a groove provided inside the cornice, sill, and coping to prevent water flows with the wall surfaceRead more

    Rebate is a top edge cut on the stone so that it does not allow the rainwater to penetrate inside the stone mortar or joint and flows quickly from the horizontal surface of stone masonry.

    Throating is a groove provided inside the cornice, sill, and coping to prevent water flows with the wall surface and allows it to discharge away from the wall surface. It protects walls from the impact of rainwater.

    Chases is a stones course provided at the top of the wall. It also protects from rainwater. It is generally constructed in an ornamental design.

     

    See less
    • 41
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Asked: August 2, 2020In: Construction Site Related

    Which structure has higher strength: Concrete or Steel?

    AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 230 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on August 10, 2020 at 8:46 pm

    Generally, strength is of two types Compressive strength Tensile strength If you are asking only for concrete then concrete is weak in tensile loads than steel. Structural Steel has the greatest strength as compared to concrete. reasons are as follows: Elastic modulus of concrete is lesser than SteeRead more

    Generally, strength is of two types

    1. Compressive strength
    2. Tensile strength

    If you are asking only for concrete then concrete is weak in tensile loads than steel.

    Structural Steel has the greatest strength as compared to concrete. reasons are as follows:

    1. Elastic modulus of concrete is lesser than Steel. This makes concrete weaker than Steel in tensile load.
    2. Strength to weight ratio of concrete is lower. Because the size of Steel reinforcement is very small and thus weight reduced.
    3. Steel is a factory manufactured and have a homogeneous structure. It is also well compacted, Which makes it better and stronger than concrete. Concrete is a mixture of cement, sand, aggregate and water where it is made at the site. so no homogeneous structure is formed.

     

    • compressive strength of reinforced concrete – 4000 psi
    • Compressive strength of structural Steel – 25000 psi
    See less
    • 39
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Asked: August 9, 2020In: Construction Site Related

    How to Check the Strength of the Brick at Site?

    aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on August 9, 2020 at 11:01 pm

    Bricks are of two sizes ; Modular bricks : 19cm *9cm * 9cm (actual size ) Non modular size : 20 cm* 10 cm* 10 cm ( commonly used; size of bricks with mortar )   When two bricks are striked against each other it Should produce clear ringing sound. This brick is known to have sufficient soundnessRead more

    Bricks are of two sizes ;

    • Modular bricks : 19cm *9cm * 9cm (actual size )
    • Non modular size : 20 cm* 10 cm* 10 cm ( commonly used; size of bricks with mortar )

     

    1. When two bricks are striked against each other it Should produce clear ringing sound. This brick is known to have sufficient soundness and without crack.
    2. When a brick is dropped from certain height of 1m on a levelled surface it shouldn’t be broken down in to pieces which depicts the toughness of the brick.
    3. When a scratch is made on the surface of the brick ; any impression on the nail shouldn’t be produced.
    4. Minimum strength of the brick used in construction work should be 3.5 N/mm^2
    5. A first class brick should have water absorption is less than 20% otherwise it will absorb water from mortar causes crack in it.
    6. A good quality brick should be of high temperature resistance. According to this properties;
    • Heavy duty brick : 1450°C – 1650°C
    • Medium duty brick : 1000°C – 1400°C
    • Low duty brick : 850°C .

    The bricks may contain harmful ingredients like alkalies, excess magnesia and excess lime. To know these values we have to do lab tests.

    See less
    • 32
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Asked: August 2, 2020In: Construction Site Related

    What are the best steps for checking reinforcement in R.C.C structure?

    dbnalawade

    dbnalawade

    • 15 Questions
    • 24 Answers
    • 2 Best Answers
    • 1,086 Points
    View Profile
    Best Answer
    dbnalawade Expert
    Added an answer on August 4, 2020 at 10:45 am

    Very important question before providing clearances to pour concrete. I would follow following steps. Ensure Contractor has bar bending schedule and approved drawing. Ensure reinforcement used are approved grade and test certificates are in place. Check  diameter of rebar ( reinforcement) Check spacRead more

    Very important question before providing clearances to pour concrete. I would follow following steps.

    1. Ensure Contractor has bar bending schedule and approved drawing.
    2. Ensure reinforcement used are approved grade and test certificates are in place.
    3. Check  diameter of rebar ( reinforcement)
    4. Check spacing
    5. Check banding radius
    6. Check number of bars
    7. Check laps are of proper length. Some time couplers are used to join the reinforcement. Couplers must be approved.
    8. Check proper cover to rebar is in place.
    9. Covers should be approved
    10. Check the reinforcement installed does not sag  or move. For this ensure you use chairs.
    11. Tie the rebars together using soft annealed lining wire and turn the know inside.
    12. Reinforcement must be clean without any dirt or coating.
    13. Some time special reinforcement steel is provided around openings. Ensure this is in place.
    14. It is normal for QC departments to use check lists for this.

    Hope this helps.

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  6. Asked: August 2, 2020In: Construction Site Related

    What is the difference between Grit and Aggregate?

    Vivek Patel

    Vivek Patel

    • 39 Questions
    • 80 Answers
    • 1 Best Answer
    • 6 Points
    View Profile
    Vivek Patel User
    Added an answer on August 2, 2020 at 11:48 pm

    Grit and aggregate all are manufactured in stone crushers. From stone crusher we get Durt Grit Artificial sand Aggregate GSB material Size of 10-20mm stone is defined as a aggregate. And size of stone <10mm is defined as a grit. Grid is used to make a well packing layer ( fill the voids). [captioRead more

    Grit and aggregate all are manufactured in stone crushers.

    From stone crusher we get

    • Durt
    • Grit
    • Artificial sand
    • Aggregate
    • GSB material

    Size of 10-20mm stone is defined as a aggregate. And size of stone <10mm is defined as a grit.

    Grid is used to make a well packing layer ( fill the voids).

    Aggregate

    Aggregate

    Grit

    Grit

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  7. Asked: August 2, 2020In: Construction Site Related

    What is surface excavation?

    Vivek Patel

    Vivek Patel

    • 39 Questions
    • 80 Answers
    • 1 Best Answer
    • 6 Points
    View Profile
    Vivek Patel User
    Added an answer on August 2, 2020 at 11:04 pm

    Surface excavation is defined as Excavation of depth up to 30cm as per IS1200-part 1 and width of excavation exceed 1.5m and Area exceed 10 square meters. It is mainly used in garden work.

    Surface excavation is defined as

    Excavation of depth up to 30cm as per IS1200-part 1 and width of excavation exceed 1.5m and Area exceed 10 square meters.

    It is mainly used in garden work.

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  8. Asked: August 2, 2020In: Construction Site Related

    What is SOR? Which department publishes SOR?

    aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on August 2, 2020 at 10:54 pm

    Schedule Of Rates (SOR) is a list of rates of various items after the analysis of them. These rates are finalized by govt body like Central Public Works Division (CPWD). It is very helpful especially in the preparation of estimates, wages of laborers, etc. Also deciding the rates of extra items addeRead more

    Schedule Of Rates (SOR) is a list of rates of various items after the analysis of them. These rates are finalized by govt body like Central Public Works Division (CPWD). It is very helpful especially in the preparation of estimates, wages of laborers, etc. Also deciding the rates of extra items added by the contractor. Generally, a clause in the conditions of contract is included, saying that, any extra item included during construction should be paid as per SOR.

    It consists of rates of various items such as demolishing items, excavation items, concrete items, RCC works, brickwork items, etc. and also information regarding the present wages of labor and prices of different items.

    The SOR is renewed or updated nearly every year bcoz of the changes in the various rates.

    It consists of basic rates of more than 2500 items and finished rates of more than 3000 items.

    It is prepared for all the civil, electrical, and mechanical dept’s.

    See less
    • 32
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
Load More Answers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.