Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction Site Related

Home/Construction Site Related/Page 6

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random
  1. Asked: July 27, 2020In: Construction Site Related

    What is the meaning of Soil Reinforcement?

    Vivek Patel

    Vivek Patel

    • 39 Questions
    • 80 Answers
    • 1 Best Answer
    • 6 Points
    View Profile
    Vivek Patel User
    Added an answer on July 28, 2020 at 10:46 pm

    Soil reinforcement is a process of improving soil stability against slope failure. Basically geogrid is used as reinforcement in soil stabilization Various type of geogrid is classified as: Extruded Geogrid type Woven Geogrid type Bonded Geogrid type Best on stretching Uniaxial geogrid type BiaxialRead more

    Soil reinforcement is a process of improving soil stability against slope failure.

    Basically geogrid is used as reinforcement in soil stabilization

    Various type of geogrid is classified as:

    • Extruded Geogrid type
    • Woven Geogrid type
    • Bonded Geogrid type

    Best on stretching

    • Uniaxial geogrid type
    • Biaxial geogrid type

    Geogrid is widely used in canal embankment, highway embankment and  soil slope stabilization.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: July 27, 2020In: Construction Site Related

    What is Bursting Reinforcement?

    CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    CB Sowmya User
    Added an answer on July 28, 2020 at 10:37 pm

    Bursting reinforcements are provided in Post-tensioned prestressed members or where bursting forces are prevailing. In post-tensioned members, the transfer of stress is through the anchorage blocks. The concrete in the vicinity of the anchorage block up to the length of the larger transverse dimensiRead more

    Bursting reinforcements are provided in Post-tensioned prestressed members or where bursting forces are prevailing. In post-tensioned members, the transfer of stress is through the anchorage blocks.

    The concrete in the vicinity of the anchorage block up to the length of the larger transverse dimension of the structure is defined as the anchorage zone. This anchorage zone is very high in bursting forces. These bursting forces can be computed using the stress trajectory studies.

    From the stress trajectories, bursting forces can be found and corresponding bursting reinforcements can be provided. These reinforcements are also called the end zone reinforcement or bursting links. This zone can be cast separately using a high grade of concrete to ensure safety.

    See less
    • 5
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Asked: July 27, 2020In: Construction Site Related

    Why is propping required for long structures once the formwork is removed?

    CB Sowmya

    CB Sowmya

    • 3 Questions
    • 53 Answers
    • 4 Best Answers
    • 5 Points
    View Profile
    CB Sowmya User
    Added an answer on July 28, 2020 at 10:13 pm

    The formworks are removed after the concrete has reached a strength at least twice its removal stress. But the members should be supported with the help of props. The reason is because of creep due to the Interfacial transition zone (ITZ). The interfacial transition zone is formed in the concrete beRead more

    The formworks are removed after the concrete has reached a strength at least twice its removal stress. But the members should be supported with the help of props. The reason is because of creep due to the Interfacial transition zone (ITZ).

    The interfacial transition zone is formed in the concrete between the aggregates and the mortar. This zone comprises of high Water cement ratio and hence is the weakest part of the concrete. Due to the high WC ratio, the hydration reaction in the ITZ produces a porous framework in the early stages. This porous network will be filled in subsequently by stronger gels such as CSH gel as the hydration reaction proceeds. But for this to take place, sufficient time is needed. As time increases, the ITZ becomes stronger.

    This is why the creep coefficient reduces as we delay the age of loading. When the props are moved, the self-weight of the structure acts on it, which is equivalent to loading the structure.

    We know that the creep coefficient when loaded at

    Seven days – 2.2

    28 days – 1.6

    One year – 1.1

    Due to the high creep coefficient, the structure may become susceptible to sagging when the props are removed soon.

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Asked: July 24, 2020In: Construction Site Related

    What should be the standard Roof height?

    DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 27, 2020 at 3:15 pm

    Generally, Residential bldgs are given 10ft roof height. If the false ceiling is provided, then the height is from 10.5 - 11ft. For commercial bldg, it is 10 - 12ft.

    Generally, Residential bldgs are given 10ft roof height. If the false ceiling is provided, then the height is from 10.5 – 11ft.

    For commercial bldg, it is 10 – 12ft.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Asked: July 24, 2020In: Construction Site Related

    What should one do if the slump test fails for a given concrete?

    Himanshu joshi

    Himanshu joshi

    • 11 Questions
    • 27 Answers
    • 0 Best Answers
    • 767 Points
    View Profile
    Himanshu joshi Learner
    Added an answer on July 25, 2020 at 7:56 pm

    If slump results from test show shear or collapsible slump, then it should be rejected, and the test should be repeated. Now, if at site RMC is used and slump results are not satisfactory, then we can manage the water-cement ratio by adding more cement content, which will increase strength. Also, weRead more

    If slump results from test show shear or collapsible slump, then it should be rejected, and the test should be repeated.
    Now, if at site RMC is used and slump results are not satisfactory, then we can manage the water-cement ratio by adding more cement content, which will increase strength.
    Also, we can use admixtures such as plasticizers or superplasticizer to maintain workability of concrete.

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  6. Asked: July 15, 2020In: Construction Site Related

    What is the meaning of Defect Liability Period(DLP)?

    Emmyvin

    Emmyvin

    • 3 Questions
    • 2 Answers
    • 0 Best Answers
    • 90 Points
    View Profile
    Emmyvin User
    Added an answer on July 24, 2020 at 5:40 pm

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    See less
    • 4
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  7. Asked: July 22, 2020In: Construction Site Related

    What are the responsibilities of a construction manager?

    DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 23, 2020 at 1:28 pm

    • Cost Estimates • Purchase of selected materials before the construction is to start • Selection of bidders • Analysis of proposals • Contract negotiations • Scheduling and Monitoring • Control on the cost of construction • Supervision of construction work

    • Cost Estimates
    • Purchase of selected materials before the construction is to start
    • Selection of bidders
    • Analysis of proposals
    • Contract negotiations
    • Scheduling and Monitoring
    • Control on the cost of construction
    • Supervision of construction work

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  8. Asked: July 22, 2020In: Construction Site Related

    How we can reduce wastage of Concrete during pumping of concrete?

    DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    Best Answer
    DevilAVRT Beginner
    Added an answer on July 23, 2020 at 1:21 pm

    Estimate pouring speed and match it production speed to avoid waiting and approaching it's setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete theRead more

    Estimate pouring speed and match it production speed to avoid waiting and approaching it’s setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete thereafter, explore the scope for casting precast blocks from leftover / used in testing, etc. concrete,
    Deploy a supervisor to be in touch with Batching Plant from site to hold or slow down concrete supply if there is any issue at the site, keep critical spare parts of Concrete Pumps, etc. available at site 24 x 7, deploy an experienced Pump operator and a Concrete specialist at the site

    1. Small precast forms(curbs, drain slabs, etc., which are needed in the project) to be kept ready at the site near the RMC pouring area fresh concrete waste needs to be handled into these forms. Optimum labor to be maintained to handle these operations.

    2. Retrieve the aggregates by washing off the waste concrete.

    3. Order the right quantity of concrete required to finish the pour, hence reducing the wastage.

    4. Have at least one spare pump at the site when pouring a large quantity of concrete.

    5. Have the right waste concrete segregation pits at RMC plants to wash the wet concrete and to retrieve the coarse aggregates.

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
Load More Answers

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.