What is the meaning of Soil Reinforcement?
Vivek Patel
Soil reinforcement is a process of improving soil stability against slope failure. Basically geogrid is used as reinforcement in soil stabilization Various type of geogrid is classified as: Extruded Geogrid type Woven Geogrid type Bonded Geogrid type Best on stretching Uniaxial geogrid type BiaxialRead more
Soil reinforcement is a process of improving soil stability against slope failure.
Basically geogrid is used as reinforcement in soil stabilization
Various type of geogrid is classified as:
Best on stretching
Geogrid is widely used in canal embankment, highway embankment and soil slope stabilization.
See lessWhat is Bursting Reinforcement?
CB Sowmya
Bursting reinforcements are provided in Post-tensioned prestressed members or where bursting forces are prevailing. In post-tensioned members, the transfer of stress is through the anchorage blocks. The concrete in the vicinity of the anchorage block up to the length of the larger transverse dimensiRead more
Bursting reinforcements are provided in Post-tensioned prestressed members or where bursting forces are prevailing. In post-tensioned members, the transfer of stress is through the anchorage blocks.
The concrete in the vicinity of the anchorage block up to the length of the larger transverse dimension of the structure is defined as the anchorage zone. This anchorage zone is very high in bursting forces. These bursting forces can be computed using the stress trajectory studies.
From the stress trajectories, bursting forces can be found and corresponding bursting reinforcements can be provided. These reinforcements are also called the end zone reinforcement or bursting links. This zone can be cast separately using a high grade of concrete to ensure safety.
See lessWhy is propping required for long structures once the formwork is removed?
CB Sowmya
The formworks are removed after the concrete has reached a strength at least twice its removal stress. But the members should be supported with the help of props. The reason is because of creep due to the Interfacial transition zone (ITZ). The interfacial transition zone is formed in the concrete beRead more
The formworks are removed after the concrete has reached a strength at least twice its removal stress. But the members should be supported with the help of props. The reason is because of creep due to the Interfacial transition zone (ITZ).
The interfacial transition zone is formed in the concrete between the aggregates and the mortar. This zone comprises of high Water cement ratio and hence is the weakest part of the concrete. Due to the high WC ratio, the hydration reaction in the ITZ produces a porous framework in the early stages. This porous network will be filled in subsequently by stronger gels such as CSH gel as the hydration reaction proceeds. But for this to take place, sufficient time is needed. As time increases, the ITZ becomes stronger.
This is why the creep coefficient reduces as we delay the age of loading. When the props are moved, the self-weight of the structure acts on it, which is equivalent to loading the structure.
We know that the creep coefficient when loaded at
Seven days – 2.2
28 days – 1.6
One year – 1.1
Due to the high creep coefficient, the structure may become susceptible to sagging when the props are removed soon.
See lessWhat should be the standard Roof height?
DevilAVRT
Generally, Residential bldgs are given 10ft roof height. If the false ceiling is provided, then the height is from 10.5 - 11ft. For commercial bldg, it is 10 - 12ft.
Generally, Residential bldgs are given 10ft roof height. If the false ceiling is provided, then the height is from 10.5 – 11ft.
For commercial bldg, it is 10 – 12ft.
See lessWhat should one do if the slump test fails for a given concrete?
Himanshu joshi
If slump results from test show shear or collapsible slump, then it should be rejected, and the test should be repeated. Now, if at site RMC is used and slump results are not satisfactory, then we can manage the water-cement ratio by adding more cement content, which will increase strength. Also, weRead more
If slump results from test show shear or collapsible slump, then it should be rejected, and the test should be repeated.
See lessNow, if at site RMC is used and slump results are not satisfactory, then we can manage the water-cement ratio by adding more cement content, which will increase strength.
Also, we can use admixtures such as plasticizers or superplasticizer to maintain workability of concrete.
What is the meaning of Defect Liability Period(DLP)?
Emmyvin
Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.
Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.
See lessWhat are the responsibilities of a construction manager?
DevilAVRT
• Cost Estimates • Purchase of selected materials before the construction is to start • Selection of bidders • Analysis of proposals • Contract negotiations • Scheduling and Monitoring • Control on the cost of construction • Supervision of construction work
• Cost Estimates
See less• Purchase of selected materials before the construction is to start
• Selection of bidders
• Analysis of proposals
• Contract negotiations
• Scheduling and Monitoring
• Control on the cost of construction
• Supervision of construction work
How we can reduce wastage of Concrete during pumping of concrete?
DevilAVRT
Estimate pouring speed and match it production speed to avoid waiting and approaching it's setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete theRead more
Estimate pouring speed and match it production speed to avoid waiting and approaching it’s setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete thereafter, explore the scope for casting precast blocks from leftover / used in testing, etc. concrete,
Deploy a supervisor to be in touch with Batching Plant from site to hold or slow down concrete supply if there is any issue at the site, keep critical spare parts of Concrete Pumps, etc. available at site 24 x 7, deploy an experienced Pump operator and a Concrete specialist at the site
1. Small precast forms(curbs, drain slabs, etc., which are needed in the project) to be kept ready at the site near the RMC pouring area fresh concrete waste needs to be handled into these forms. Optimum labor to be maintained to handle these operations.
2. Retrieve the aggregates by washing off the waste concrete.
3. Order the right quantity of concrete required to finish the pour, hence reducing the wastage.
4. Have at least one spare pump at the site when pouring a large quantity of concrete.
5. Have the right waste concrete segregation pits at RMC plants to wash the wet concrete and to retrieve the coarse aggregates.
See less