Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction

Home/Construction

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: September 8, 2020In: Construction

Can we place a 500 liter water tank on a 2″ Kadapa slab placed at 6 feet height supported by two solid block walls?

aviratdhodare
aviratdhodare

aviratdhodare

  • 37 Questions
  • 252 Answers
  • 0 Best Answers
  • 480 Points
View Profile
aviratdhodare

Can we place a 500-liter water tank on a 2″ Kadapa slab placed at 6 feet height supported by two solid block walls?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on September 19, 2020 at 2:24 pm
    Can we place a 500 liter water tank on a 2″ Kadapa slab placed at 6 feet height supported by two solid block walls?

    Hi, Kadappa stone of 2" ( 50.8mm ) having its density in the range of 5.0 to 5.4 kg/cm^3 with a water absorption ratio of less than 2%. After calculation, you may found that at 6-meter height, it is not able to bear the weight of a 500-liter water tank. Thus, support in the middle must be provided fRead more

    Hi,

    Kadappa stone of 2″ ( 50.8mm ) having its density in the range of 5.0 to 5.4 kg/cm^3 with a water absorption ratio of less than 2%.

    After calculation, you may found that at 6-meter height, it is not able to bear the weight of a 500-liter water tank.

    Thus, support in the middle must be provided for stability and to increase the bearing strength of kadapa so that it lasts for a long duration.

    See less
    • 49
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 34
  • 3 3 Answers
  • 4,368 Views
  • 0 Followers
Asked: September 25, 2020In: Construction

What is the correct procedure of designing surplus weir in irrigation?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

Give the correct procedure of designing surplus weir.

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on September 28, 2020 at 11:36 pm

    Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank. Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplRead more

    Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank.

    Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplus weir. Fixation of this level depends on the availability/demand of water.

    Max water level (MWL): It is the max level of water allowed in the tank. MWL is higher than FTL. The difference between MWL & FTL is the spillage or head on crest of surplus weir Fixation of this level depends on the submergence of land due to back water.

    Tank bund level (TBL): It is the top level of the liqd of the bund & is equal to MWL + freeboard.

    Abutment: The walls that flank the edge of a weir and which support the banks on each side of the weir. The length of the abutment is generally kept same as the base width of weir. The top level of the abutment is kept at tank bund level.

    Wing wall: A wall on a weir that ties the structure into the bank in continuation of the abutments. Wing walls are provided both on the u/s and d/s sides on both the banks to ensure smooth entry and exit of water away from the tank.

    Return wall (Return): These are provided at right angles to the abutment at the end of wing wall and extend into the banks to hold the back-fill.

    Splay: Horizontal deviation of wall. Ex: 1 in 3, 1 in 5, etc.

    Batter: Vertical deviation of wall. Ex: 1 in 8, 1 in 12, etc.

    Hydraulic gradient, Saturation gradient (or) Seepage gradient: It is the head loss
    (energy loss) per unit length in the direction of flow traveled by water particle through soil. Ex: Saturation gradient 4:1, it means to dissipate energy of 1m, water should travel a distance of 4 m in the soil

    Catchment area(watershed area, drainage area, drainage basin or basin or
    catchment): It is a portion of land which catches the rain and produces runoff through a one outlet.

    Free catchment: Entire runoff in the catchment will be passed direct to tank. It means water from catchment area is not go to other tank or channels, and it should directly goes to one tank.

    Intercepted catchment: Part of runoff will be intercepted and stored by the u/s side tank(s) within the catchment.

    Combined catchment: Entire runoff in the catchment will be shared by group of tanks or a chain of tanks which comes under the same catchment.

    D/S Apron of the surplus weir: Depending upon the foundation particulars, and the levels of U/S and D/S ground at the location of the work, any one of the following types can be adopted.

    Type A → Horizontal masonry apron – when fall height < 75 cm

    Type B → Sloping apron

    Type C → Similar to B but with rough stone sloping

    Type D → Stepped apron – when fall height ⩾ 75 cm

    Location of surplus weir: It is desirable to locate the surplus weir at or near the flank of the tank bund and connected to it, and also at a place where it is possible to drain the surplus waters below the work away from the tank bund falling into its natural watercourse. The cost of works should be minimum.

    Design a surplus weir for a minor tank forming a group of tanks with the following data:
    Combined catchment area                                                      = 25.89 km2 (35 km2)
    Intercepted catchment area                                                   = 20474 km2 (10 km2)
    Top width of the bund                                                             =2m (2m)
    Side slopes of the bund                                                           = 2:1 both sides (2:10n both sides)
    Top level of bund                                                                      = +1450 (+ 12.50)
    Maximum Water Level (MWL)                                             =+ 12.75 (+ 10.75)
    Full Tank Level (FTL)                                                              = + 12.00 (+ 10.00)
    General ground level at the site                                             =+ 11.00 (+ 9.00)
    Ground level slopes off to a level in about 6 m distance) = + 10.00 (+ 8.00 in about 6 m dist)
    The foundations are of hand gravel                                      = + 9.50 (+ 7.50)
    Saturation gradient                                          = 4:1 with 1 m clearcover (4:1 with 1m clearcover)
    Provision is to be made to store water up to MWL in-times of necessity

    Components to be designed

    (1) Estimation of flood discharge entering the tank (Q) :
    Combined catchment area (M) # 25.89 km2
    intercepted catchment area (m) = 20.71 km2
    Assuming Ryve’s coefficient(C) =9 and c = 1.5
    Flood discharge (Q) = CM2/3 – cm2/3
    Q = 9 (25.89)2/3 — 1.5 (20.71)2/3 = 78.77 — 11.32
    Q = 67.45 m3/s

    (2) Length of surplus weir (L):
    Assuming the flow over a surplus weir is identical to that of flow over a rectangular weir then discharge is given by Q = 2/3 CdL √2g h3/2
    where, Q = 67.45 m3/s, cd = 0.562 (assuming), g = 9.841 m/s2
    h = MWL – FTL = 12.75 — 12.00 = 0.75 m, L — Length of the water way
    67.45 = 2/3 x 0.562 x L √2×9.81 (0. 7s)3/2 → L=62.75 m ≈ 63.00 m (say)
    Since temporary regulating arrangements are to be made on top of weir to store water at times of necessity.
    The dam stones of size 15 x 15 x 125 cm are at 1m clear internals keeping top of the stone at M.W.L.
    The no. of openings will be = 63, The no. of dam stones required = 62
    ∴ The overall length of surplus weir between abutments = 63 + (62 x 0.15)
    = 72.30 m
    However, provide an overall length of 75 m.

    (3) Height of the weir (H):
    Crest Level = FTL = +12.00
    Top of dam stones (top of shutters) = M.W.L = + 12.75
    Ground level = + 11.00
    Hard soil at the foundation is + 9.50.
    However, taking foundations about 0.50 m deep into hard soil and fix up foundation level at + 9.00
    Assuming foundation concrete is 60 cm thick
    Top of foundation concrete = + 9.60
    Height of weir above foundations (H) = 12.00 – 9.60 = 2.4m

    (4) Crest width of weir (a):
    a = 0.55 (√H + √h) = 0.55(√2.4 + √0.75) = 1.3m

    (5) Base width of weir (b):
    The base width is determined based on moment considerations. i.e., based on the magnitude of stabilizing and destabilizing moments.
    Stabilizing moments are caused by self weight of the weir which is given by
    M = γw /12 = [{(G+15)H + 2.5S}b2 + a(GH – H – S)b – ½a2 (H +3S)]
    Where, γw = Unit weight of water = 1000 kg/m3
    G = Specific gravity of masonry = 2.25
    H = Height of the weir = 2.40 m
    a = Crest width of weir = 1.30 m
    b = Base width of the weir = ?
    S = h = height of shutter above weir crest = 12.75 – 12.00 = 0.75 m
    Destabilizing moments (M,)
    Mr = γw (H + S)3 / 6
    Equating both the moments: M,=M
    Mr = (2.4 + 0.75)3 / 6 = 1 /12 [{2.25 + 1.5)2.4 + 2.5 x 0.75} b2 + 1.3 (2.25 x 2.4 – 2.4 – 0.75)b – ½ (1.3)2 (2.4 + 3 x 0.75)]
    Solving, b = 2.4 m

    (6) Abutments, Wing walls and Returns:
    The top width of abutments, wing walls & returns will all be uniformly 0.50 m with a front batter of 1 in 8. Diag in attachment.
    Abutment (AB)
    Length of the abutment = width of bund = 2m
    The top level of the abutment is kept at TBL = + 14.50
    Bottom level of the abutment = top of foundation level = + 9.60
    Height of the abutment = 14.50 — 9.60 = 4.90 m
    Bottom width= 0.4 x height = 0.4 x 4.90 = 1.96 m = 2.00 m (say)
    Top width 2 0.5 m (assuming), Front batter = 1 in 8
    Wing walls:
    U/S Wing Wall:
    BD is called u/s wing wall
    Section at B:
    Same as the section of abutment
    Wing wall from B to C is sloping and
    Top level of C = M.W.L + 30 cm = 12.75 + 0.30 = 13.05
    Section at C:
    Top Level at C = 13.05
    Bottom level = 9.60
    Height of wing wall = 13.05 – 9.60 = 3.45 m
    Bottom width = 0.4 x height = 0.4 x 3.45 = 1.38 = 1.40 m (say)
    Top width from B to C is the same as 0.5 m.
    But, bottom width gets slowly reduced
    from 2.00 m at section at B to 1.40 m at Section C:
    From C to D wing wall is horizontal. Therefore, Section at D = Section at C
    U/S Return (DE):
    Section at E = Section at D
    U/S transition:
    In order to give an easy approach, the u/s side wing wall may be splayed at 1 in 3.
    D/S wing wall:
    AF is called d/s wing wall.
    Section at A: Same as the section of abutment. The Wing wall from A to F will slope down till the top reaches the ground level at F.
    Section at F:
    Top of wing wall at F = + 11.00
    Bottom of wing wall = + 9.60
    Height = 11.00 – 9.60 = 1.40 m
    Bottom width = 0.4 x 1.4 = 0.56 m
    However, provide a minimum of 0.6 m
    D/S return (FG):
    The same section at F is continued for FG also
    D/S transitions:
    Provide a splay of 1 in 5.

    (7) Aprons of the weir:
    i). U/S Apron: Though apron is not required on the u/s side of the weir, a puddle clay apron is usually provided to minimize the seepage under the weir.
    ii).D/S Apron: Since the ground level is falling down to +10.00 in a distance of about 6m. Then, the fall is (12.00 – 10.00) = 2.00 m > 0.75 m therefore provide a stepped apron (Type D) Diagram in attachment. The stepping may be done in two stages.
    (a) The length of the Apron: The length of the apron should be adequate to avoid piping problem.
    [Maximum uplift will be occurred when water level on U/S is up to top of dam stone (M.W.L.) and no water on D/S (+10.00))
    Max. Uplift head = 12.75 – 10.00 = 2.75 m (max. energy to be dissipated)
    Assuming a hydraulic gradient of 1 in 5
    The length of the creep required = 2.75 x 5 = 13.75 m
    The length and thickness of apronts to be designed.
    The length of the creep = AB + BC + CD + DE + EF = 1.40 + 0.60 + 3.00 + DE + 1 (Assuming EF = 1 m)
    This length should not be less than 13.75 m, if the structure is to be safe.
    13.75 = 1.40 + 0.60 + 3.00 + DE + 1 → DE = 7.75 m = 8.0 m (say)
    Provide total length of solid apron ts 8 m.
    First step in 3 m and second step in 5 m length.
    (b) Thickness of solid apron: The maximum uplift on the apron is felt immediately above the point D. (i.e., at point K)
    Assuming the thickness of apron at point K = 80 cm = 0.80 m.
    Then the level of K = 11.00 – 0.80 = 10.20
    The length of the creep from A to K = 1.4 + 0.6 + 3 + 0.6 + (10.20 – 9.60) = 6.20 m
    Head loss in percolation along the path up to the point K = 6.20/5 = 1.24 m
    Residual head exerting uplift under the apron at point K = 2.75 – 1.24 = 1.51 m
    Thickness of apron required = Residual head / Sp. gravity = 1.51/2.25 = 0.67 m
    Provide 20% of more thickness as a safety
    Then thickness of apron required = 0.80 m
    So, provide the first solid apron as 80 cm thick.
    The second apron can be similarly checked for a thickness of 50 cm.

    8) Talus: At the end of d/s side apron, a nominal 3 to § m length of Talus (i.e., rough stone apron) with a thickness of 50 cm may be provided as a safety mechanism.

     

    See less
    • 36
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 1 1 Answer
  • 6,547 Views
  • 0 Followers
Asked: May 31, 2016In: Construction

What is the difference between Tender and Contract Documents?

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 75 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

What are the difference between Tender and Contract Documents? Can we mention tender documents as contract document while issuing LOA to  the Contractor. if no then what is the difference?

  1. Gopal Mishra

    Gopal Mishra

    • 75 Questions
    • 44 Answers
    • 7 Best Answers
    • 577 Points
    View Profile
    Best Answer
    Gopal Mishra
    Added an answer on June 1, 2016 at 11:45 pm

    To understand the difference between tender documents and contract documents, first we have to understand what these documents contain. Tender Documents: A tender is an offer in writing to contractors to execute the some specified works or to supply specified materials within a fixed time frame andRead more

    To understand the difference between tender documents and contract documents, first we have to understand what these documents contain.

    Tender Documents:

    A tender is an offer in writing to contractors to execute the some specified works or to supply specified materials within a fixed time frame and as per conditions of contract and agreement between the contractor and the owner or the department or the party.

    The tender documents contains the bill of quantities (BOQ), specifications of the works to be carried out, time frame for the completion of the work, conditions of the contract and plans and drawings. These documents are provided to the contractor on the payment of certain fees. The contractor who quotes the lowest rates for the overall works are offer the contract to execute the work.

    Contract Documents:

    Contract documents are the agreement between the owner or the party or the department and the contractor to execute the works as specified in the tender documents as per conditions of contract on the rates quoted by the contractor.

    The difference between Tender and Contract Documents:

    The difference here to be noted is that tender documents are offered to as many contractors as possible to get the lowest quotes for the work specified, while the contract documents are signed only with the contractor with lowest tender or rates.

    While the tender documents contains the conditions of contract and all the details for the specified work, there is not much difference between the two in terms of contents. But tender documents can not be submitted as Letter of Acceptance (LOA) as these are two different types of documents. While a tender document can not bind the contractor to do the work, a contract document binds the contractor to complete the work as per the agreement.

    Simple Example to understand the difference between tender and contract documents:

    When you are selected for a job in a company you are offered offer letter to join the company. But getting selected in a company does not mean that you join the same company, you may have other offer letters as well. But when you sign the letter of acceptance (LOA) for the job, you are bound to join the company. So, here offer letter from the company is a tender document and LOA is the contract document.

    See less
    • 78
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 13 13 Answers
  • 82,096 Views
  • 3 Followers
Asked: September 22, 2020In: Construction

Mechanism of rotating tower lacated at Dubai?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

Mechanism of rotating tower lacated at Dubai ?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 28, 2020 at 11:19 pm
    Mechanism of rotating tower lacated at Dubai?

    Rotating Tower: Mechanism of rotating Tower: Mechanism of rotating Tower is very interesting to understand.  1)The whole steel structure is constructed with reference to Central Core and highly reinforced Foundation. 2)Driving system- every flower in the rotating Tower can be rotated around the centRead more

    Rotating Tower:

    Mechanism of rotating Tower:

    Mechanism of rotating Tower is very interesting to understand. 

    1)The whole steel structure is constructed with reference to Central Core and highly reinforced Foundation.


    2)Driving system- every flower in the rotating Tower can be rotated around the central Core which is connected by rails.


    3) Load cases: Different loads that are dead load life load wind load and earthquake loads are taken into account while designing the rotating Tower.


    4)Optimisation analysis: The stresses and deformation directly acting on the core of the rotating tower are very high.


    5)Alternative designs of the rotating tower:

    1. Alternative 1- Architects design
    2. Alternative 2- higher concrete grade
    3. Alternative 3- increased wall thickness
    4. Alternative 4- outrigger braced concrete Core
    5. Alternative 5- perimeter columns with Stiff floors

    6) Architect name:

    • RotatingTower is developed by the Italian architect David Fisher.

    7)  Shape of rotating Tower:

    • Because of the rotation of all floors can be possible independently, the building can transform into every different imaginable shape.

    8) Height of rotating Tower:

    • The original design of the rotating tower height is approximately 435 metre.

    9) Current need:

    • The current design of the stabilizing core of the rotating tower doesn’t intersect any essential need. Hence investigation of the structure according to the stiffness and strength is really very important parameter.

    10)Speciality of rotating Tower:

    • All the floors of the rotating tower can separately rotate with reference to the common axis located at the centre of the tower.
    • Rotating Tower is only one building in which it’s all floors can rotate 360-degree angle.
    • Every Apartment can spin individually in any direction

    See less
    • 35
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 2 2 Answers
  • 2,649 Views
  • 0 Followers
Asked: September 29, 2020In: Construction

What should be the standard dimension of ventilator in home?

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

What should be the standard dimension of ventilator in home?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 5:52 pm

    Thank you everyone.

    Thank you everyone.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 3 3 Answers
  • 7,351 Views
  • 0 Followers
Asked: July 10, 2020In: Construction

What are the properties of good building stones?

Shivan
Shivan

Shivan

  • 9 Questions
  • 0 Answers
  • 0 Best Answers
  • 56 Points
View Profile
Shivan User

What are the properties of good building stones?

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on January 14, 2021 at 2:11 pm
    This answer was edited.

    APPEARANCE The stone to be used for facework must have uniform and pleasing color. It must be free from cavities, crack, flaws and patches of loose and soft materials. STRENGTH A good bldg stone should have sufficient crushing strength to withstand the load of superstructure. It should ≮ 1000 kg/cm²Read more

    APPEARANCE

    • The stone to be used for facework must have uniform and pleasing color.
    • It must be free from cavities, crack, flaws and patches of loose and soft materials.

    STRENGTH

    • A good bldg stone should have sufficient crushing strength to withstand the load of superstructure.
    • It should ≮ 1000 kg/cm².

    HARDNESS, TOUGHNESS AND RESISTANCE TO ABRASION

    • The stone to be used in stone pavements, as railway ballast or road metal must be sufficiently hard, tough, resistance to abrasion.
    • It must be able to resist wear and tear.

    DURABILITY

    • A good bldg stone must be durable enough to resist the effect of weathering against eg., rain, wing, temp, etc.
    • It should have fine grained, compact, and crystalline structure.

    TEXTURE

    A good bldg stone should have a closed grained and compact texture.

    WORKABILITY

    The stone to be used for ornamental craving and architectural appearance should be easily and economically dressed.

    SEASONING

    The stone to be used for an imp interior work should be well seasoned. Presence of moisture makes the stone soft and it is liable to an early decay when used in structural work.

    POROSITY

    • A good bldg stone should be less porous.
    • It should not absorb more than 5% of water.
    • Any stone absorbing 10% of water should be rejected.

    RESISTANCE TO FIRE

    • A good bldg stone should be able to resist high temp.
    • Its minerals constitutes should have equal coeff for expansion.

    SPECIFIC GRAVITY

    • The stone to be used on heavy engg works, docks, harbours, gravity dams, etc must have high specific gravity.
    • Its varies from 2.4 – 2.8.

    RESISTANCE TO ELECTRICITY

    • A good bldg stone should be non-absorbent like marble and slate etc.
    • It can offer good resistance to electricity.
    See less
    • 8
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 33
  • 16 16 Answers
  • 88,215 Views
  • 0 Followers
Asked: September 8, 2020In: Construction

How do I do the micro modeling of a masonry wall in STRAND7?

aviratdhodare
aviratdhodare

aviratdhodare

  • 37 Questions
  • 252 Answers
  • 0 Best Answers
  • 480 Points
View Profile
aviratdhodare

How do I do the micro modeling of a masonry wall in STRAND7?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on September 19, 2020 at 2:24 pm
    How do I do the micro modeling of a masonry wall in STRAND7?

    STRAND 7 is a software used for finite element analysis(FEA) developed by a strand 7 company. Following are some solvers used for micro modelling in strand 7. Natural frequency Harmonic and spectral response Nonlinear in static Buckling Nonlinear and linear transient heat transfer Nonlinear and lineRead more

    STRAND 7 is a software used for finite element analysis(FEA) developed by a strand 7 company.

    Following are some solvers used for micro modelling in strand 7.

    1. Natural frequency
    2. Harmonic and spectral response
    3. Nonlinear in static
    4. Buckling
    5. Nonlinear and linear transient heat transfer
    6. Nonlinear and linear steady-state transfer heat
    7. Static in a linear direction
    8. Static in nonlinear direction
    9. Nonlinear and linear transient dynamic

    Refer the official link of STRAND 7 for detailed information and various applications in civil engineering.

    See less
    • 46
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 32
  • 1 1 Answer
  • 1,175 Views
  • 0 Followers
Asked: September 22, 2020In: Construction

What is the effect of dewatering on the soil.

nikeetasharma
nikeetasharma

nikeetasharma

  • 23 Questions
  • 303 Answers
  • 0 Best Answers
  • 2,680 Points
View Profile
nikeetasharma Guru

what is the effect of dewatering on the soil?

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on September 23, 2020 at 3:07 pm

    Potential Groundwater Impacts of Dewatering ·        Contamination Dewatering can cause the advancement of hydraulic gradients that are additionally fundamental for drawing out water towards wells. Dewatering close to a site with a background marked by contamination in groundwater can bring out hydrRead more

    Potential Groundwater Impacts of Dewatering

    ·        Contamination

    Dewatering can cause the advancement of hydraulic gradients that are additionally fundamental for drawing out water towards wells. Dewatering close to a site with a background marked by contamination in groundwater can bring out hydraulic gradients that can convey the dirtied groundwater towards the dewatering framework and cause contamination. By and large, polluted water requires filtration. To evade this issue, the best technique is to introduce screen dividers and vertically separate regions utilizing bentonite seals.

    ·        Geotechnical Damage

    Dewatering can make the ground lose coherence; the result leads to ground settling. If the ground settling is vast, it can harm close by building and structures. When groundwater is removed from the soil, it makes the soil pack and squeeze. It can likewise also caused by small soil & shallow grounds being removed with the groundwater through well.

    This effect can be diminished by a better plan and the utilization of good filtration and groundwater treatment that keep the particles from being separated.

    ·        Impacts on Water Features

    Things that depend on the water like rivers, lakes, and springs have a cozy relationship with groundwater and are, in this way, influenced by dewatering and groundwater control by prohibition. It is essential to keep in mind that groundwater and water-dependent things have eco-systems and fill in as territories. An unfriendly impact of these water bodies will have a huge -ve effect on the earth.

    ·        Water Resource Depletion

    When groundwater is removed for longer periods and in huge amounts for personal or commercial use, it can conceivably bring down groundwater levels and reduce yields. This exhaustion brings about a decrease in significant water assets for other people. An answer to this issue can be an artificial recharge method that infuses release from siphon water back in the ground.

    Conclusion

    It is crucial to perceive and decrease the effects of dewatering and groundwater control on the earth as dependable residents of the world. We should embrace great construction dewatering treatment system design, examination strategies, and better groundwater remediation innovation to alleviate these issues before it is past the point of no return.

    See less
    • 31
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 32
  • 1 1 Answer
  • 1,179 Views
  • 0 Followers
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.