Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What is the reason behind the initial setting time of cement should not be less that 30min.?

Home/ Questions/Q 149829
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: October 5, 20202020-10-05T23:01:20-07:00 2020-10-05T23:01:20-07:00In: Interview Questions
Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 49 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,050 Points
View Profile
Komal Bhandakkar AUTHOR

What is the reason behind the initial setting time of cement should not be less that 30min.?

  • 22
  • 5 5 Answers
  • 4,571 Views
  • 0 Followers
  • 1
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

5 Answers

  • Voted
  • Oldest
  • Recent
  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    2020-10-08T21:49:25-07:00Added an answer on October 8, 2020 at 9:49 pm

    Hi,

    Initial Setting Time is regarded as the time elapsed between the moment that the water is added to the cement to the time that the paste starts losing its plasticity.

    In actual construction dealing with cement paste, mortar, or concrete, a particular time is required to mix, transport, place, compact, and finish. During this time, cement paste, mortar, or concrete should be in plastic condition. The time interval for which the cement products remain in the plastic condition is known as Initial Setting Time.

    The final setting time should not be more than 10 hours.

    Usually, a minimum of 30 minutes is given for mixing and handling operations.

    Final Setting Time elapsed between the moment water is added to the cement and the time when the paste has wholly lost its plasticity and has attained sufficient firmness to resist absolute definite pressure.

    The constituents and fineness of cement are maintained to remain in plastic condition for a particular minimum time. Once the concrete is placed in the final position, compacted and finished, it should lose its plasticity in the earliest possible time to be least vulnerable to damages from external destructive agencies.

    Hope you get the concept.

    • 39
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-10-08T19:25:30-07:00Added an answer on October 8, 2020 at 7:25 pm

    The main reason behind the initial setting time of cement should not be less than 30 min is that the initial setting time is the exact moment when the concrete starts to harden. In theory, this time starts as soon as the water is added to the cement. The final setting time is the moment the concrete has hardened enough so that a five-millimetre square needle no longer penetrates the surface.

    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-05T23:23:30-07:00Added an answer on October 5, 2020 at 11:23 pm
    This answer was edited.

    Initial setting time:

    When we deal with cement, mortar or concrete during the construction process then the time required for mixing, transportation, placement, compaction, and finishing is more.

    During this whole time, our cement should be in plastic condition and it should not be set. 

    The time which is required for the cement products remain in a plastic condition is known as initial setting time. Usually, a minimum of 30 minutes is the initial setting time. 

    It is the time required for mixing and handling operations.


    Thank You.

    • 31
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-09T21:20:37-07:00Added an answer on October 9, 2020 at 9:20 pm
    This answer was edited.
    What is the reason behind the initial setting time of cement should not be less that 30min.?

    Initial setting time of various types of cement:

    • The value of the initial setting time is different for a different type of cement.

    • The initial setting time of Quick setting cement is only 5 minute.

    • The initial setting time of low heat cement is 60 minutes

    • But usually, another type of cement has 30minutes is the value of initial setting time.

    Please refer the above image for knowing the values of initial setting time and final setting time for various types of cement.


    Thank you.

    • 30
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. sanjaypakad

    sanjaypakad

    • 0 Questions
    • 9 Answers
    • 0 Best Answers
    • 232 Points
    View Profile
    sanjaypakad Beginner
    2020-10-08T17:37:47-07:00Added an answer on October 8, 2020 at 5:37 pm

    In this time cement can be molded in any desired shape without losing its strength. This is the time at which the hardening of the cement starts and the only time available for mixing the paste and placing it in position. if this time less then 30 min then can’t molded in any shape in many situations.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.