what are the components of a unit rate in civil engineering?
Resection Method. This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:- Select the two stations P & Q on the ground & measure the length PQ & pRead more
Resection Method.

This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:-
- Select the two stations P & Q on the ground & measure the length PQ & plot to a scale pq on a suitable scale.
- Set the table at P , Centre, & level the table so that the point p is over the P.
- Place the alidade along pq, orient the table by turning the board until the signal at Q is bisected, & then clamp it.
- With the alidade touching at p sight the station R & draw a ray p to r.
- Shift the table at R. & make the center & level & sight the point P by back sighting & clamp the table.
- With the alidade centered on q, sight the station Q & draw a ray. The point of intersection of this ray & that previously drawn from p gives the reqd point r.
AdityaBhandakkar
Hi, According to NRM(NEW RULES OF MEASUREMENT) which is published by the royal institute of chartered surveyors, ---it is a monetary rate applied to a component or element per unit of measurement. e.g cost per metre cube for a cross internal floor area, cost per functional unit etc. It is a standardRead more
Hi,
According to NRM(NEW RULES OF MEASUREMENT) which is published by the royal institute of chartered surveyors,
—it is a monetary rate applied to a component or element per unit of measurement. e.g cost per metre cube for a cross internal floor area, cost per functional unit etc.
It is a standard of measurement for planning or estimation for various construction projects.
See less