How is resection done in survey?
The below 7 jobs are the highest paying civil engineer field jobs that are: Structure Engineering (Average salary up to $100000) Geotechnical Engineering (Average salary up to $50000-$80000) Construction Engineering (Average salary up to $150000) Transportation Engineering (Average salary up to $850Read more
The below 7 jobs are the highest paying civil engineer field jobs that are:
- Structure Engineering (Average salary up to $100000)
- Geotechnical Engineering (Average salary up to $50000-$80000)
- Construction Engineering (Average salary up to $150000)
- Transportation Engineering (Average salary up to $85000)
- Water Resource Engineering (Average salary up to $88000)
- Environment Engineering (Average salary up to $88500)
- Design Engineering (Average salary up to $73000)
aviratdhodare
Resection Method. This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:- Select the two stations P & Q on the ground & measure the length PQ & pRead more
Resection Method.
This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:-
- Select the two stations P & Q on the ground & measure the length PQ & plot to a scale pq on a suitable scale.
- Set the table at P , Centre, & level the table so that the point p is over the P.
- Place the alidade along pq, orient the table by turning the board until the signal at Q is bisected, & then clamp it.
- With the alidade touching at p sight the station R & draw a ray p to r.
- Shift the table at R. & make the center & level & sight the point P by back sighting & clamp the table.
- With the alidade centered on q, sight the station Q & draw a ray. The point of intersection of this ray & that previously drawn from p gives the reqd point r.
See less