How we can reduce wastage of Concrete during pumping of concrete?
No. Load Bearing Structure Frame Structure 1. Almost all the walls are load bearing walls. None of the wall are load bearing. They serve the same purpose as partition or screen. 2. Almost all the should be provided with foundation None of the walls are provided with any type of foundation. Walls doRead more
| No. | Load Bearing Structure | Frame Structure |
| 1. | Almost all the walls are load bearing walls. | None of the wall are load bearing. They serve the same purpose as partition or screen. |
| 2. | Almost all the should be provided with foundation | None of the walls are provided with any type of foundation. Walls do not go below the plinth beam. |
| 3. | Load bearing walls are taken deep into the subsoil foundation. | Only column are taken deep into subsoil and provided with foundation footing. |
| 4. | Any load bearing wall should have minimum thickness of 200 mm. | Exterior wall subjected to weathering elements are generally 200 mm thick. All other wall can be 100 mm thick or even thinner. |
| 5. | Wall are usually constructed of bricks or stone. | Column supporting beam supporting slab are all of R.C. C. |
| 6. | In a multi-storeyed building for every wall in the floor above there must be a corresponding wall in continuation in the floor below to support it. | There is no such necessity. As none of the walls are load bearing. Every floor may have wall independent of the one below it. |
| 7. | In a multi – storeyed building the thickness of the wall increase as we descend from a floor above to one below it. | These walls do not take the load and need not be thicker. They may not even continue in the floor below. |
| 8. | A load bearing wall once constructed shall remain in position and should never be dismantled in full or part. | The wall of framed structure can be displaced at will as they are lighter and non load bearing. |
| 9. | This type of construction does not favor toomany openings for windows, doors, ventilation etc., in the ground floor as required for show room etc., as the load bearing length of wall is considerably reduced. | The space between column can remains as open space as the case with multi – storeyed residential flats where the ground floor is left with no walls for easy parking of vehicle. |
| 10. | In case of multi – storeyed buildings, the room area is reduced as we go down due to thicker walls. | Thickness of wall remains uniform, therefore the carpet area in any floor remains the same. |
| 11. | Plans of the different floors must be the same. Very little changes are only possible between one floor and the one above. | Plans of different floor are independent of each floor. The ground floor may have a commercial complex, first floor an office or a bank and second floor onward of residential complexes of different types of plans and function within the same building. |
| 12. | May not withstand seismic forces and other forces and other type of vibration because composed of different blocks as bricks and stones being bonded together. | More rigid and withstand seismic forces because of the entire frame of column, beam and slabs act as one unit of R.C.C. |

DevilAVRT
Estimate pouring speed and match it production speed to avoid waiting and approaching it's setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete theRead more
Estimate pouring speed and match it production speed to avoid waiting and approaching it’s setting time, keep home work-ready with trials for options (e.g., redosing with SP) for reusing leftover concrete, inform Batching plant when 10% of the pour is balanced and reduce trucks carrying concrete thereafter, explore the scope for casting precast blocks from leftover / used in testing, etc. concrete,
Deploy a supervisor to be in touch with Batching Plant from site to hold or slow down concrete supply if there is any issue at the site, keep critical spare parts of Concrete Pumps, etc. available at site 24 x 7, deploy an experienced Pump operator and a Concrete specialist at the site
1. Small precast forms(curbs, drain slabs, etc., which are needed in the project) to be kept ready at the site near the RMC pouring area fresh concrete waste needs to be handled into these forms. Optimum labor to be maintained to handle these operations.
2. Retrieve the aggregates by washing off the waste concrete.
3. Order the right quantity of concrete required to finish the pour, hence reducing the wastage.
4. Have at least one spare pump at the site when pouring a large quantity of concrete.
5. Have the right waste concrete segregation pits at RMC plants to wash the wet concrete and to retrieve the coarse aggregates.
See less