Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction Site Related

Home/Construction Site Related/Page 5

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: July 15, 2020In: Construction Site Related

What is the meaning of Defect Liability Period(DLP)?

fathima
fathima

fathima

  • 26 Questions
  • 10 Answers
  • 0 Best Answers
  • 377 Points
View Profile
fathima Beginner

What is the meaning of the defect liability period?

  1. Emmyvin

    Emmyvin

    • 3 Questions
    • 2 Answers
    • 0 Best Answers
    • 90 Points
    View Profile
    Emmyvin User
    Added an answer on July 24, 2020 at 5:40 pm

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    See less
    • 4
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 2
  • 1 1 Answer
  • 5,937 Views
  • 0 Followers
Asked: July 27, 2020In: Construction Site Related

What is the meaning of Soil Reinforcement?

DevilAVRT
DevilAVRT

DevilAVRT

  • 27 Questions
  • 49 Answers
  • 3 Best Answers
  • 207 Points
View Profile
DevilAVRT Beginner

What is the meaning of Soil Reinforcement?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 28, 2020 at 1:30 pm

    Soil reinforcement is the process used to improve the stiffness and the strength of soil using geo-engineering methods.

    Soil reinforcement is the process used to improve the stiffness and the strength of soil using geo-engineering methods.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 7 7 Answers
  • 5,315 Views
  • 0 Followers
Asked: July 13, 2020In: Construction Site Related

Explain various types of Roof covering materials?

DevilAVRT
DevilAVRT

DevilAVRT

  • 27 Questions
  • 49 Answers
  • 3 Best Answers
  • 207 Points
View Profile
DevilAVRT Beginner

Explain various types of Roof covering materials?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on November 20, 2020 at 1:40 pm
    This answer was edited.

    Here, I will be discussing the concrete tile roofing materials. concrete tile: The concrete tile consists of nearly 70% sand, 20% cement, nearly 9% water & only 1%pigment plus some additive. The manufacturing method of concrete tile: Extrusion Wet pressing Core molding & vibration molding. TRead more

    Here, I will be discussing the concrete tile roofing materials.

    concrete tile:

    The concrete tile consists of nearly 70% sand, 20% cement, nearly 9% water & only 1%pigment plus some additive.

    The manufacturing method of concrete tile:

    1. Extrusion
    2. Wet pressing
    3. Core molding & vibration molding.

    Thank You. 

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 3 3 Answers
  • 5,278 Views
  • 0 Followers
Asked: November 23, 2017In: Construction Site Related

What is Difference Between Load Bearing and Frame Structure?

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 75 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

What is the difference between a load bearing structure and a frame structure? How load is transferred in load bearing and framed structures?

  1. DevilAVRT

    DevilAVRT

    • 27 Questions
    • 49 Answers
    • 3 Best Answers
    • 207 Points
    View Profile
    DevilAVRT Beginner
    Added an answer on July 4, 2020 at 12:20 pm

    No. Load Bearing Structure Frame Structure 1. Almost all the walls are load bearing walls. None of the wall are load bearing. They serve the same purpose as partition or screen. 2. Almost all the should be provided with foundation None of the walls are provided with any type of foundation. Walls doRead more

    No. Load Bearing Structure Frame Structure
    1. Almost all the walls are load bearing walls. None of the wall are load bearing. They serve the same purpose as partition or screen.
    2. Almost all the should be provided with foundation None of the walls are provided with any type of foundation. Walls do not go below the plinth beam.
    3. Load bearing walls are taken deep into the subsoil foundation. Only column are taken deep into subsoil and provided with foundation footing.
    4. Any load bearing wall should have minimum thickness of 200 mm. Exterior wall subjected to weathering elements are generally 200 mm thick. All other wall can be 100 mm thick or even thinner.
    5. Wall are usually constructed of bricks or stone. Column supporting beam supporting slab are all of R.C. C.
    6. In a multi-storeyed building for every wall in the floor above there must be a corresponding wall in continuation in the floor below to support it. There is no such necessity. As none of the walls are load bearing. Every floor may have wall independent of the one below it.
    7. In a multi – storeyed building the thickness of the wall increase as we descend from a floor above to one below it. These walls do not take the load and need not be thicker. They may not even continue in the floor below.
    8. A load bearing wall once constructed shall remain in position and should never be dismantled in full or part. The wall of framed structure can be displaced at will as they are lighter and non load bearing.
    9. This type of construction does not favor toomany openings for windows, doors, ventilation etc., in the ground floor as required for show room etc., as the load bearing length of wall is considerably reduced. The space between column can remains as open space as the case with multi – storeyed residential flats where the ground floor is left with no walls for easy parking of vehicle.
    10. In case of multi – storeyed buildings, the room area is reduced as we go down due to thicker walls. Thickness of wall remains uniform, therefore the carpet area in any floor remains the same.
    11. Plans of the different floors must be the same. Very little changes are only possible between one floor and the one above. Plans of different floor are independent of each floor. The ground floor may have a commercial complex, first floor an office or a bank and second floor onward of residential complexes of different types of plans and function within the same building.
    12. May not withstand seismic forces and other forces and other type of vibration because composed of different blocks as bricks and stones being bonded together. More rigid and withstand seismic forces because of the entire frame of column, beam and slabs act as one unit of R.C.C.
    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 4
  • 2 2 Answers
  • 4,712 Views
  • 0 Followers
Asked: July 24, 2020In: Construction Site Related

What should one do if the slump test fails for a given concrete?

CB Sowmya
CB Sowmya

CB Sowmya

  • 3 Questions
  • 53 Answers
  • 4 Best Answers
  • 5 Points
View Profile
CB Sowmya User

What should one do if the slump test fails for a given concrete?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 18, 2020 at 3:44 pm

    If the slump test fails for concrete then immediately reject that concrete because high amount of water can decrease the durability of the concrete. But dont add water if the slump test fails.

    If the slump test fails for concrete then immediately reject that concrete because high amount of water can decrease the durability of the concrete. But dont add water if the slump test fails.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 2
  • 3 3 Answers
  • 4,404 Views
  • 0 Followers
Poll
Asked: October 13, 2020In: Construction Site Related

How to rectify the old cement pipeline leakage problem?

Akshay Deshmukh
Akshay Deshmukh

Akshay Deshmukh

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 10 Points
View Profile
Akshay Deshmukh User

How to rectify the old cement pipeline leakage problem?

  1. BASAVARAJ nimbalakar

    BASAVARAJ nimbalakar

    • 0 Questions
    • 2 Answers
    • 0 Best Answers
    • 55 Points
    View Profile
    BASAVARAJ nimbalakar User
    Added an answer on October 28, 2020 at 11:13 pm

    control the pipe leackage by using NiTo bond chemical first we need to dry that pipe Chip the pipe surface where leakage problem is there Brush the chipped surface completely and clean with water.  And allow to dry Then apply Ninto bond coating on the surface The complete the mason work by fresh conRead more

    control the pipe leackage by using NiTo bond chemical

    • first we need to dry that pipe
    • Chip the pipe surface where leakage problem is there
    • Brush the chipped surface completely and clean with water.  And allow to dry
    • Then apply Ninto bond coating on the surface
    • The complete the mason work by fresh concrete… And cure it for 10 to 15 days
    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 3 3 Answers
  • 4,401 Views
  • 0 Followers
Asked: August 2, 2020In: Construction Site Related

What is surface excavation?

vivek gami
vivek gami

vivek gami

  • 54 Questions
  • 16 Answers
  • 5 Best Answers
  • 93 Points
View Profile
vivek gami User

What is surface excavation?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 7:29 pm

    Surface excavation involves the removal of the exposed layer of the earth surface, including any vegetation or decaying matter which could make the soil compressible and therefore unsuitable for bearing structural loads. Hence the depth will be vary from site to site, usually range of 150-300 mm.

    Surface excavation involves the removal of the exposed layer of the earth surface, including any vegetation or decaying matter which could make the soil compressible and therefore unsuitable for bearing structural loads. Hence the depth will be vary from site to site, usually range of 150-300 mm.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 5 5 Answers
  • 4,236 Views
  • 0 Followers
Asked: July 28, 2020In: Construction Site Related

What is the moisture content limits in plastered walls before we take up the painting work?

dbnalawade
dbnalawade

dbnalawade

  • 15 Questions
  • 24 Answers
  • 2 Best Answers
  • 1,086 Points
View Profile
dbnalawade Expert

What is the moisture content limits in plastered walls before we take up the painting work?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 18, 2020 at 6:33 pm

    Moisture readings must be taken to assure that not more than 12% moisture content is in the plaster prior to the application of any coating.

    Moisture readings must be taken to assure that not more than 12% moisture content is in the plaster prior to the application of any coating.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 3 3 Answers
  • 4,118 Views
  • 0 Followers
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.