Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Structural Engineering

Home/Structural Engineering/Page 2

Do you need to remove the ads? Get the paid membership

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: June 18, 2020In: Structural Engineering

What are the Primary and secondary load-bearing structures of high-rise concrete buildings?

civil sons
civil sons

civil sons

  • 2 Questions
  • 0 Answers
  • 0 Best Answers
  • 10 Points
View Profile
civil sons User

What are the Primary and secondary load-bearing structures of high-rise concrete buildings? Bracing against the lateral load of wind and earthquake

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on August 21, 2020 at 1:23 pm

    Walls, beams, columns, foundations etc can be called as primary or main load bearing components of a concrete building. Examples of secondary load bearing structures would be the lintels in masonry walls, the shelf angles that support finishes when they span over a window or other opening and there Read more

    Walls, beams, columns, foundations etc can be called as primary or main load bearing components of a concrete building.

    Examples of secondary load bearing structures would be the lintels in masonry walls, the shelf angles that support finishes when they span over a window or other opening and there are other odd and ends that provide support or stabilization such as cross bracing in steel bar joist or structural elements used during the construction of the building.

    See less
    • 34
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 4,811 Views
  • 0 Followers
Asked: July 17, 2020In: Structural Engineering

Which pressure us higher in retaining wall, water or soil?

vivek gami
vivek gami

vivek gami

  • 54 Questions
  • 16 Answers
  • 5 Best Answers
  • 93 Points
View Profile
vivek gami User

Which pressure us higher in retaining wall, water or soil?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 12 Questions
    • 230 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on September 7, 2020 at 6:12 pm

    In technical terms, Above the Water table, Pressure exerted by water on retaining wall = 0.5 K.H^2 K = coefficient of earth pressure H= vertical height of wall. Total stress = effective stress + pore water pressure. Earth pressure due to soil: Total stress = effective stress.  

    In technical terms,

    Above the Water table,

    Pressure exerted by water on retaining wall = 0.5 K.H^2

    K = coefficient of earth pressure

    H= vertical height of wall.

    Total stress = effective stress + pore water pressure.

    Earth pressure due to soil:

    Total stress = effective stress.

     

    See less
    • 42
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 4
  • 2 2 Answers
  • 2,575 Views
  • 0 Followers
Asked: May 18, 2020In: Structural Engineering

Which Type of Cement is used for Pile Foundation?

poojan
poojan

poojan

  • 5 Questions
  • 14 Answers
  • 1 Best Answer
  • 604 Points
View Profile
poojan Learner

Which type of cement is used in the construction of a pile foundation? Kindly mention the references from codes or guides for the answer.

  1. Madeh Izat Hamakareem

    Madeh Izat Hamakareem

    • 0 Questions
    • 40 Answers
    • 3 Best Answers
    • 1,229 Points
    View Profile
    Best Answer
    Madeh Izat Hamakareem
    Added an answer on May 18, 2020 at 11:35 pm

    Any type of cement can be used as long as the design and durability requirements of the concrete used to construct the pile are met. For instance, if the sulfate attack is expected, it is desirable to select sulfate resistance cement because it produces concrete that withstand sulfate attack. As a rRead more

    Any type of cement can be used as long as the design and durability requirements of the concrete used to construct the pile are met. For instance, if the sulfate attack is expected, it is desirable to select sulfate resistance cement because it produces concrete that withstand sulfate attack. As a result, the produced concrete would durable.

    You can visit the following link to read more about Applications of Different Types of Cement for Concrete Construction:

    https://theconstructor.org/building/applications-cement-types-concrete/7686/

    The ACI code 318-18 provides the design and durability requirements of concrete.

    Design Requirements of Concrete Based on ACI 318-19

    https://theconstructor.org/concrete/design-requirements-concrete/39004/

    Concrete Durability Requirements Based on ACI-318-19

    https://theconstructor.org/concrete/concrete-durability-requirements/39036/

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 2 2 Answers
  • 5,887 Views
  • 0 Followers
Asked: July 7, 2020In: Structural Engineering

How to treat the under design poured concrete on shearwall?

lei
lei

lei

  • 2 Questions
  • 0 Answers
  • 0 Best Answers
  • 30 Points
View Profile
lei User

How to treat the under design poured concrete on shearwall? example: the designed strength of concrete (f’c) must be 7000 psi however it was poured by only f’c=5000psi?  

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 49 Questions
    • 240 Answers
    • 0 Best Answers
    • 2,050 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 5, 2020 at 8:25 am
    How to treat the under design poured concrete on shearwall?

    Design of poured concrete on the shear wall: When the final f'c extrapolated from a break of 3 days then an additional break of 5 days (it is usually 3, 7 & 28 days), it is directly indicated that the first cylinder itself was defective. When the f'c of 5000psi was one of the 28th day (i.e. finaRead more

    Design of poured concrete on the shear wall:

    • When the final f’c extrapolated from a break of 3 days then an additional break of 5 days (it is usually 3, 7 & 28 days), it is directly indicated that the first cylinder itself was defective.
    • When the f’c of 5000psi was one of the 28th day (i.e. final) result, then it clearly indicates that it’s necessary to return the design engineer who is specified f’c 7000.
    • It is really possible that he or she can review their previous calculations and determine lower compression that will still satisfy their own design.
    • If it is not so then it will clearly requirement of other physical attributes like load, span, etc. it will have to be adjusted.
    • Practically on a job, I was inspecting probably 3-day break spec, 5-day break, confirmed below fake spec.
    • Usually, the contractor decided to tear the wall out and repour, but later on, it was determined to be a mechanical failure at the batch plant where only half the cement was batched.
    • In case of another multi-storey hotel, it wasn’t the compression, it was the lack of adequate reconsolidation including vibration.
    • When the forms where is stripped from a large, significance and poured in place shear wall, there were a large number of voids -some the size of a basketball.
    • It was ultimately referred to the engineer, who specified filling a large number of voids with a simple compound.
    • I personally didn’t feel particularly warm and fuzzy about the fix, but the engineer seemed more satisfied.

    • One example of which I know is that a cantilevered deck at an officer’s club, on a military base.

    But after all, the testing fell short of the design, the general contractor, and batch plant manager approach to the officer in charge (Airforce colonel which is assigned to oversee the project) to propose one of the serious field testings to demonstrate that the cantilever would work.

    Finally, he decided to redo it.

    See less
    • 39
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 1 1 Answer
  • 1,082 Views
  • 0 Followers
Asked: July 2, 2020In: Structural Engineering

What is Web Crippling in Steel ?

Mangala Karunarathne
Mangala Karunarathne

Mangala Karunarathne

  • 4 Questions
  • 4 Answers
  • 0 Best Answers
  • 123 Points
View Profile
Mangala Karunarathne Beginner

What is Web Crippling in Steel?

  1. Ancy Joby

    Ancy Joby

    • 20 Questions
    • 11 Answers
    • 1 Best Answer
    • 580 Points
    View Profile
    Ancy Joby Learner
    Added an answer on July 3, 2020 at 4:54 pm

    Webs of rolled section are subjected to large amount of stresses just below concentrated loads and above reactions from support. Stress concentration occurs at junction of web and flange. As a result, large bearing stresses are developed below concentrated load. Consequently, the web near portion ofRead more

    Webs of rolled section are subjected to large amount of stresses just below concentrated loads and above reactions from support. Stress concentration occurs at junction of web and flange. As a result, large bearing stresses are developed below concentrated load. Consequently, the web near portion of stress concentration tends to fold over flange. This type of local buckling phenomenon is called crippling or crippling of web.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 1 1 Answer
  • 3,414 Views
  • 0 Followers
Asked: April 24, 2021In: Structural Engineering

Is it safe not to build a colunm at an intersection of two beams?

Yousuf arian
Yousuf arian

Yousuf arian

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 25 Points
View Profile
Yousuf arian User

Is it safe not to build a column at an intersection of two beams?

  1. Fasi Ur Rahman

    Fasi Ur Rahman

    • 4 Questions
    • 36 Answers
    • 1 Best Answer
    • 1,323 Points
    View Profile
    Fasi Ur Rahman
    Added an answer on April 24, 2021 at 7:51 pm

    Yes, it is safe not to build a column at an intersection of two beams subjected that all the loads are considered, calculated, and transferred via columns placed at the end of the beams.

    Yes, it is safe not to build a column at an intersection of two beams subjected that all the loads are considered, calculated, and transferred via columns placed at the end of the beams.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 1,464 Views
  • 0 Followers
Asked: October 17, 2020In: Structural Engineering

What is the reinforced concrete deep beam and where it used?

Abbas Hilo
Abbas Hilo

Abbas Hilo

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 10 Points
View Profile
Abbas Hilo User

What is the reinforced concrete deep beam and where it used?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on December 18, 2020 at 6:26 pm

    Reinforced concrete deep beam is defined as that members with clear spans in equal or less than four times the overall member depth or regions of beams that are loaded on one face with concentrated loads within twice the member depth from the support and supported on the opposite face so that compreRead more

    Reinforced concrete deep beam is defined as that members with clear spans in equal or less than four times the overall member depth or regions of beams that are loaded on one face with concentrated loads within twice the member depth from the support and supported on the opposite face so that compression struts can be developed between the loads and supports.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 3
  • 4 4 Answers
  • 6,583 Views
  • 0 Followers
Asked: May 15, 2020In: Structural Engineering

What are quickest method to find deflection and slope in beams?

Ankita Pal
Ankita Pal

Ankita Pal

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 5 Points
View Profile
Ankita Pal User

During GATE, IES exam it is difficult to follow any traditional method to follow from start to end solution. What are the conceptual shortcuts to find slope and deflection of the beam which can be used to find a solution ...

  1. Kuldeep Singh

    Kuldeep Singh

    • 1 Question
    • 110 Answers
    • 10 Best Answers
    • 652 Points
    View Profile
    Kuldeep Singh Learner
    Added an answer on July 5, 2020 at 5:25 pm

    Well, if you're analyzing a beam, then the quickest and easiest way is hands down, the moment - area method. Students often overlook it and delve into complex methods while the problem may be solved a lot easily. Other than this, there are often other quick methods depending on the question. For exaRead more

    Well, if you’re analyzing a beam, then the quickest and easiest way is hands down, the moment – area method. Students often overlook it and delve into complex methods while the problem may be solved a lot easily.

    Other than this, there are often other quick methods depending on the question. For example sometimes the conjugate beam method is not such a bad choice. If you can write the moment curvature equation and are quick at differentiation, you can use that.

    I for one, never get into slope deflection method unless it is strictly needed. I stick to moment area, conjugate beam and the 4th order differential equation.

    Also, a friendly tip : just have a look at the options especially in the IES paper. They never push you into long calculations. You could sense that some options just have to be wrong and are nowhere close to be correct. In GATE, this approach doesn’t fare well though.

    Hope it helps.

    See less
    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 2 2 Answers
  • 3,352 Views
  • 0 Followers
Load More Questions

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.