Sign Up

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Sign In


Have an account? Sign In Now

Sign In

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Sign Up Here

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have a permission to ask a question, You must login to ask question. Get the paid membership

Join for free or log in to continue reading...


Forgot Password?

Don't have account, Sign Up Here
Get the paid membership
theconstructor.org Logo theconstructor.org Logo
Log inJoin

theconstructor.org

theconstructor.org Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write for us
  • Community
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital Construction
    • Geotechnical
      • Foundation
  • Case Studies
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

What should be the height of the plinth level in flood-prone areas?

Home/ Questions/Q 47743
Next
In Process

Do you need to remove the ads? Get the paid membership

Asked: August 2, 20202020-08-02T09:36:03-07:00 2020-08-02T09:36:03-07:00In: Construction
GK
GK

GK

  • 1 Question
  • 3 Answers
  • 0 Best Answers
  • 101 Points
View Profile
GK Beginner

What should be the height of the plinth level in flood-prone areas?

  • 0
  • 3 3 Answers
  • 2,913 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

3 Answers

  • Voted
  • Oldest
  • Recent
  1. Amol M.

    Amol M.

    • 0 Questions
    • 8 Answers
    • 0 Best Answers
    • 207 Points
    View Profile
    Amol M. Beginner
    2020-08-02T23:04:32-07:00Added an answer on August 2, 2020 at 11:04 pm

    The average plinth height is up to 450mm is considered.

    But in floor prone areas it is increased by 150mm as per requirement. After the study of the area plinth height should be considered.

    So the average hight of the plinth in flood-prone areas is considered up to 600mm above from the HFL. (high flood level).

    • 2
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. dbnalawade

    dbnalawade

    • 15 Questions
    • 24 Answers
    • 2 Best Answers
    • 1,086 Points
    View Profile
    dbnalawade Expert
    2020-08-04T11:55:56-07:00Added an answer on August 4, 2020 at 11:55 am

    As rightly pointed out by Amol HFL could help you decide plinth level. Follow the local guidelines. HFL determination should be based on historic records with public authority. It is not just plinth level but even the access roads to your house or finish grade levels around your house or community should be developed by site improvement works to level well above HFL.

     

    Hope this helps.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    2020-08-10T20:46:10-07:00Added an answer on August 10, 2020 at 8:46 pm
    1. Plinth levels of all buildings should be 0.6 m above the drainage/flood submersion levels under the mean annual flood.
    2. All the buildings should preferably be two or more storeys.
    3. In single-storey buildings, a stairway must be provided to the roofs which could be used as temporary shelter for which roof should be made of flat type.
    4. The roof levels of the single-storey buildings and the first floor level in double-storey buildings should be kept above 100-year flood levels.

    For more detailed guidelines, follow the Building Materials and Technology Promotion Council

    • 36
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...


Forgot Password?

Need An Account, Sign Up Here

Sidebar

Explore

  • Questions
  • Ask Questions
  • Write for us
  • Artificial Intelligence
  • Sustainability
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Twitter
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.